Incat Crowther to Design 79-ft Cat Passenger Ferry

Tuesday, March 01, 2011
Image courtesy Incat Crowther

Incat Crowther announced the design of a 79-ft catamaran passenger ferry to be built by Baltic Workboats in Estonia. The vessel is a follow up to the Incat Crowther-designed 79-ft catamaran scientific research catamaran under construction at the yard, and will be operated in the Gulf of Riga, Estonia.

 
Incat Crowther worked closely with Baltic workboats in their successful bid, developing a vessel utilizing the same platform as the research vessel. As part of the development process, changes were made not only to meet the operator’s requirements, but also to streamline the build process, including the use of prefabricated extrusion-based panels.
 
The close cooperation between Incat Crowther and Baltic Workboats resulted in a winning bid selected as the most suitable vessel for the operation, offering the best value. In addition to passengers, two vehicles will be carried on the aft deck, with deck capacity allowing vehicles up to 6.5m in length, and axle loads up to 2.4t. Vessels will be loaded via the stern-mounted ramp. There is also an 8t-m Guerra M 75.90A1 Deck Crane for loading cargo. The aft deck has passenger loading gates situated amidships and is connected to the passenger cabin through a large passageway that houses the passenger toilets. The forward end of the main deck cabin accommodates all 60 passengers and also features a small bar and luggage racks. At the aft end of the cabin is a crew area that comprises of a crew mess, twin cabin and bathroom. 
 
The vessel will be powered by a pair of Volvo D16MH R2 main engines, each producing 751hp. It will have a service speed of 22 knots and a top speed of 26 knots.
Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Naval Architecture

Damen Responds to Evolving Fishing Practices

Maaskant Shipyards Stellendam meets fishing sector’s growing needs by performing electric pulse fishing conversions   As European fishing policies evolve, so fishing techniques advance.

Damen Delivers Survey Vessel to Fugro

Fugro Frontier is the third vessel in a series received by Fugro during 2014   Three months after its last delivery, Fugro has received the third of a series

Vard Wins Farstad's OSCV Contract

Vard Holdings Limited (“VARD”) has secured a contract for the design and construction of one Offshore Subsea Construction Vessel (“OSCV”) for Farstad Shipping (“Farstad”).

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Pipelines Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0956 sec (10 req/sec)