BMT, Ares Deliver Luxury Passenger Ferries

MarineLink.com
Tuesday, April 22, 2014
Photo courtesy of BMT

BMT Nigel Gee (BMT), a subsidiary of BMT Group, and Ares Shipyard announced that the first two boats of a series of eight luxury passenger ferries destined for Qatar, have been completed and delivered to the customer. BMT worked closely with Ares Shipyard to produce an innovative design with particular attention to ease of construction.  This has allowed the first two vessels to be delivered to the customer less than seven months after initial discussions on the project. The remaining six vessels will be delivered over the next four months with four currently in build.

Designed specifically to transport guests to the new Anantara Doha Island Resort & Spa, 11km east of Doha, the vessel is highly capable and has the visual appearance to match.  At 18m long with a beam of 6.7m, the composite catamaran design can carry up to 51 passengers in comfort and style.  Business class seating and refreshment facilities are provided on board within a fully air conditioned passenger saloon. The vessel is capable of a maximum speed of 29 knots, and a service speed of 22 knots meaning that a typical passage from Doha to the resort will be in the region of 16 minutes. 

Kerim Kalafatoglu, Managing Director of Ares Shipyard commented, “In order to support the opening of the resort, it was important to deliver the first vessel early in 2014. BMT Nigel Gee proved again that it is one of very few design companies that can develop robust design solutions, whilst providing suitable levels of support during such an aggressive build schedule, without major discrepencies and delays.”

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter February 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Nordana Sea Delivered to Symphony Shipping

After successful sea trials, M.V. Nordana Sea was delivered to Symphony Shipping on February 11, 2016. Constructed by builder Ferus-Smit in the Netherlands (yard number 419),

James Troop Supplies Engines for 3 Naval Vessels

Liverpool City Region (UK) based ship engine specialist James Troop & Co has won an order to supply Volvo Penta diesel engines for three European naval vessels being built on Merseyside.

OSV Delivered to MC2 in Dubai

Marine Core & Charter LLC (MC2) headquartered in Dubai has taken delivery of the new build PETRA-1, the first of two, 45-meter Fast Offshore Support Vessels in

Naval Architecture

BAE Systems Awarded £201m to Advance Successor Sub Design

The U.K. Ministry of Defence (MoD) has awarded BAE Systems £201 million to further the design of a successor to the Royal Navy's Vanguard class submarines.   The

The Next Generation of Hull Performance Management

Hull performance monitoring solutions can offer significant fuel savings potential, a fact that is prompting growing interest from the maritime industry. To spur

GTT, DSME Partner for NO96 Max Development

GTT signs a cooperation agreement with Daewoo Shipbuilding & Marine Engineering aiming at the industrialization of its NO96 Max technology   GTT, a designer of

Vessels

Nordana Sea Delivered to Symphony Shipping

After successful sea trials, M.V. Nordana Sea was delivered to Symphony Shipping on February 11, 2016. Constructed by builder Ferus-Smit in the Netherlands (yard number 419),

Maersk to Scrap Ships at India's Alang Beaches, NGO Dismayed

Maersk Line said on Friday it had chosen four shipbreaking yards along India's Alang beaches to handle an increase in vessels that need to be scrapped, to the dismay

Video: Catapult Testing on Aircraft Carrier Abraham Lincoln

U.S. shipbuilder Huntington Ingalls Industries’ (HII) Newport News Shipbuilding division has begun testing the updated catapult systems aboard the U.S. Navy aircraft

Ferries

BMT Provides Ferry Design for River Murray

BMT Design & Technology Pty Ltd (BMT), a subsidiary of BMT Group Ltd, has completed a design project for the South Australian Government’s Department of Planning, Transport and Infrastructure (DPTI).

Meyer Turku Lays Keel of Tallink’s LNG Ferry

The keel of the Tallink’s new LNG-powered fast ferry Megastar was laid at the Meyer Turku shipyard   The hull assembly of Tallink’s new fast ferry Megastar started

PVA Elects 2016 Leadership

During the PVA Annual Convention at MariTrends 2016 held January 23-26 in Crystal City, Va., members of the Passenger Vessel Association (PVA) elected Margo Marks of Beaver Island Boat Company,

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0885 sec (11 req/sec)