FPSO Arrives at Petrobas Offshore Brazil Site

Press Release
Wednesday, January 02, 2013

Floating Production Storage & Offloading (FPSO) vessel 'Cidade de Itajaí' arrives at the Santos Basin.

Petrobras announce the FPSO's arrival at its definitive location to be integrated to the Baúna and Piracaba field production system, which is in the Santos basin post-salt area.

Chartered from OOG-TKP (the consortium formed by Odebrecht Óleo e Gás & Teekay Petrojarl), the vessel is being prepared for anchoring and is expected to start producing yet this month.

The FPSO-type unit, which produces, processes, and stores oil, is capable of processing up to 80,000 barrels of light oil and of compressing 2 million cubic meters of natural gas per day. The platform will be interconnected to six production and five injector wells, of which four used for water and one for gas.


 

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Enterprise Contracts to Boost U.S. Crude Exports

Enterprise bumps up exports through annual contracts; signs 2015 contracts with PDS, Vitol; seeks one more term buyer. U.S. exports of condensate have been given

Tighter Supertanker Market Impacts Asian Fuel Supplies

The window to sell Western fuel oil to Asia is starting to close as demand for a limited fleet of supertankers to store cheap crude pushes freight rates to multi-month highs,

CFE to Lift Eight LNG Cargoes

Mexican state-owned utility CFE has bought eight cargoes of liquefied natural gas (LNG), four traders said. Swiss trading house Trafigura was awarded the bulk of the volume,

Offshore

Panama Flag Approval for Seagull

Seagull Maritime has become the first overseas company to secure training centre approval from the Panama Maritime Authority following the PMA’s 2014 change of leadership.

New Chemical Handling Service from Ferguson Group

Tank, Fluid Solutions and Bunded Storage for Dangerous Goods and Chemicals Introduced at Gap Ridge, Karratha.    Ferguson Group Australia, global specialist in offshore DNV 2.

InterMoor Completes Juniper Mooring Installation Contract

InterMoor has completed a mooring and foundation installation campaign for bpTT’s Juniper gas project offshore Trinidad and Tobago, reportedly the largest foundation

Offshore Energy

World's Largest Ship Sparks Outrage

Jewish groups in the Netherlands and Britain have reacted with rage and despair at the arrival in Rotterdam of the world's biggest ship, the Pieter Schelte, named

Hofste, Montijn Nominated to Supervisory Board Fugro

Fugro N.V. announces that the Supervisory Board of Fugro nominates Mrs. P.H.M. Hofsté and Mrs. A.H. Montijn for appointment as members of the Supervisory Board

Technip Certified to EDGE Standard

Technip and EDGE Certified Foundation announce today that Technip in Brazil, in France and in Italy, including flexible pipe manufacturing plants in Brazil and France and Group’s headquarters,

Underwater Engineering

InterMoor Completes Juniper Mooring Installation Contract

InterMoor has completed a mooring and foundation installation campaign for bpTT’s Juniper gas project offshore Trinidad and Tobago, reportedly the largest foundation

Hofste, Montijn Nominated to Supervisory Board Fugro

Fugro N.V. announces that the Supervisory Board of Fugro nominates Mrs. P.H.M. Hofsté and Mrs. A.H. Montijn for appointment as members of the Supervisory Board

Subsea Crane Takes a Long Journey

Last September the test bed in Rostock was the stage of a single lift of the RL-K 7500 subsea crane. The same crane was then loaded and shipped to the South Korean customer.

 
 
Maritime Contracts Naval Architecture Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1351 sec (7 req/sec)