Shell to Shut in Auger Platform

MarineLink.com
Wednesday, July 17, 2013

Nearly two decades after setting a world water-depth record for drilling and production, Shell’s Auger tension-leg platform is still playing a central and innovative role in the company’s deep water Gulf of Mexico portfolio – currently producing some 55,000 barrels oil equivalent (boe) per day (Shell share ~30,000 boe per day), and acting in the future as the host platform for the Cardamom subsea development. The Cardamom discovery well also set records three years ago, for subsurface length and depth. With the latest seismic and drilling technologies, the Cardamom development is expected to deliver new production from the deep waters of the Gulf of Mexico to existing infrastructure.


More than a half mile down, Shell is connecting Cardamom wells back to Auger - work that will involve retrofitting the platform and a production shut-in at Auger, which should restart in the fourth quarter of 2013. Once online in 2014, Cardamom (100% Shell share) is expected to produce at a peak rate of 50,000 boe per day.

"The Gulf of Mexico remains an important part of Shell’s portfolio and strategy, and it is expected to generate substantial growth over the next several years,” said John Hollowell, Executive Vice President for Deep Water, Shell Upstream Americas. “Cardamom is a great example of using existing infrastructure to increase oil and gas production in a less capital intensive way.”

In its lifetime, the Auger platform has produced more than 300 million boe.

 

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

New CEO for Evergas

Evergas has appointed Steffen Jacobsen as CEO of the company as of 8 May 2015 Mr. Jacobsen joined Evergas 1 February 2015 as Vice President, Fleet after almost 35 years in Maersk.

Italian Navy Takes Back Fishing Boat Seized Near Libya

The Italian navy took back control on Friday of a Sicilian fishing boat that had been seized overnight by unknown assailants near the Libyan coast, the defence ministry said.

Steelhead Introduces a New Yacht Crane

Steelhead Marine, a North American crane manufacturer, has expanded its product offering with the launch of the new E Series 1000 crane. Suited for commercial and recreational vessels,

Energy

New CEO for Evergas

Evergas has appointed Steffen Jacobsen as CEO of the company as of 8 May 2015 Mr. Jacobsen joined Evergas 1 February 2015 as Vice President, Fleet after almost 35 years in Maersk.

Icebreakers Ordered for Neft’s Novy Port Project

Aker Arctic’s icebreaker design selected for Gazprom Neft’s Novy Port project   Aker Arctic and Vyborg Shipyard have confirmed a contract for the design of two

MacGregor's Pusnes bow loading systems for Suezmax Tankers

MacGregor, part of Cargotec, has secured contracts to supply Pusnes bow loading systems for three newbuild shuttle tankers intended for operations in Brazilian waters.

Offshore Energy

New CEO for Evergas

Evergas has appointed Steffen Jacobsen as CEO of the company as of 8 May 2015 Mr. Jacobsen joined Evergas 1 February 2015 as Vice President, Fleet after almost 35 years in Maersk.

Royal IHC Launches Sister Pipelay Vessels

Netherlands-based Royal IHC today named and launched new pipelaying sister vessels, Sapura Jade and Sapura Ônix, in ceremonies at the company’s shipyard in Krimpen aan den IJssel, The Netherlands.

CWind Orders Four Crew Transfer Vessels

CWind, a provider of services to the offshore wind industry, has placed an order for four new crew transfer vessels from Aluminium Marine Consultants (AMC), a shipbuilding

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1092 sec (9 req/sec)