BOEMRE to Hold Industry Workshop on Plan Processing

Tuesday, March 08, 2011

The Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE) will host a one-day workshop in New Orleans to discuss standards and requirements for exploration and development plans, with an emphasis on the new safety requirements that have been implemented over the past six months.

 
“BOEMRE has participated in many meetings with oil and gas companies to explain new plan requirements, and we are continuing those outreach efforts through workshops such as this,” said BOEMRE Director Michael R. Bromwich. “We are making every effort – in every way – to help companies understand and comply with the new requirements for exploration and development processing plans to ensure our nation’s vital offshore energy resources are developed safely and responsibly.”
 
The purpose of the workshop is to discuss various issues regarding plan requirements and to facilitate the ability of applicants to meet the new requirements in their plan submissions.  The workshop will provide information on plan submissions related to:
 
   -   Exploration and Development Plans
   -   Worst Case Discharge Calculations (NTL No. 2010-N06)
   -   National Environmental Policy Act (NEPA)
   -   Oil Spill Response Plans
   -   Spill Response and Containment (NTL No. 2010-N10)  
 
The workshop will be held on March 25, 2011, from 8:00 a.m. to 4:00 p.m. at the BOEMRE Gulf of Mexico Region Office in Elmwood, 1201 Elmwood Park Boulevard, New Orleans, La, 70123.
 
This one-day workshop will be open to Gulf of Mexico Region Outer Continental Shelf (OCS) oil and gas stakeholders.  There is no registration required for this event.  However, seating is limited. 
 
For more information, contact:  Nick.Wetzel@boemre.gov
 
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Valemon Topsides Installed

On Monday, July 28, the topsides were lifted into place on the steel jacket on the Valemon field in the North Sea. Produced by Samsung Heavy Industries this is

Offshore Installation at Lerwick

A large steel oil storage tank to be installed west of Shetland as part of Premier’s development of the Solan field has arrived in Lerwick onboard a heavy-transport vessel Xiang Yun Kou,

Wagenbourg New Crane for Oil, Gas, Energy Sector

Wagenborg Nedlift has expanded her crane fleet with a brand new 700 tonnes mobile crane. With this crane the fleet is significantly strengthened. Equipped with

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pod Propulsion Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1973 sec (5 req/sec)