Osiris Projects Launches New Survey Vessel

Posted byEric Haun
Thursday, November 21, 2013
MV Proteus

Specialist seabed mapping company Osiris Projects has this week launched the fifth vessel in their fleet, the 14m GRP catamaran MV Proteus. Designed to provide an excellent working platform for coastal survey operations, MV Proteus can work up to 60 miles from a safe haven under MCA Category 2 and has a maximum speed of 24 knots. The vessel benefits from a shallow draft of just 1m making her ideal for inshore operations, while the hull design ensures exceptional maneuverability at both low and high speeds and incorporates a low drag profile providing excellent fuel economy.

The vessel is equipped with high grade positioning systems including an Inertial Navigation System (INS) and acoustic Ultra Short Baseline (USBL) acoustic positioning system for towfish tracking. The large back deck features a moon pool fitted with a hydraulic retractable hydrodynamic gondola designed to house a high grade multibeam echo sounder systems. Proteus is permanently mobilized with an AGO-CSW7 electric sonar winch which when combined with the hydraulic A-Frame, allows for the safe launch and recovery of geophysical equipment including side scan sonar, sub bottom profilers and marine magnetometers. A separate hydraulic lifting winch enables oceanographic and benthic survey equipment to be launched and recovered from the vessel including small inspection class ROV/drop down camera, various grab sampling equipment and benthic trawls. Additional custom designed over side mounts and davits allows for the vessel to be configured for a range of client requirements. This capability optimizes consistency between datasets acquired by Proteus and Osiris Projects’ 24hr vessels; 27.5m DP1 flagship MV Bibby Tethra and 26.5m MV Chartwell.

Proteus is the fourth custom build project undertaken by Osiris Projects, following the launch of 12m MV Freja in 2002, 15.3m catamaran MV Lia in 2004, and the aforementioned MV Bibby Tethra in 2011. The success of Bibby Tethra, particularly in challenging sea conditions, has led the company to pursue the build of a sister ship to be built to the same fundamental design with a number of minimal alterations scheduled for launch in January 2015. Both Lia and Freja have also proven highly effective in coastal environments, and have completed over 200 marine survey contracts for marine renewables and oil and gas client alone.

osirisprojects.co.uk
 

Maritime Reporter August 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

“K” Line and Ports America Deal on Strategic Partnership

KAWASAKI KISEN KAISHA, LTD. (“K” Line) is pleased to announce that “K” Line and Ports America have agreed to form a strategic partnership aimed at enhancing

New Tolls Structure at Panama Canal

The Panama Canal Authority has advised that a new tolls structure will be introduced when the expanded Canal opens. The proposal the Authority plans to present

Children’s Day at Gazprom Transgaz Saratov

On May 31 and June 1, 2014 . Over two thousand children from the Saratov, Tambov and Penza Regions took part in sports competitions, environmental quizzes and

Vessels

Scottish Sea Farms Takes New Vessel Delivery

Scottish Salmon Farms has taken delivery of its latest vessel – powered by twin Doosan V158TIH main engines supplied by WaterMota.   Designed by consultant naval

Pre-Mooring Safety Inspections at Trieste, Italy

The SIOT/TAL Terminal at Trieste has advised that the TAL Pre-Mooring Safety Inspection program will be modified from 1 September. The checks at road will affect:

Hornbeck Offshore Ride High on Q2 2014 Results

Hornbeck Offshore Services, Inc. has announced its financial results for the second quarter ended June 30, 2014.  Following are highlights for this period and excerpts

Surveyors

ABS President Wiernicki Signs New MARAD Agreement

The American Bureau of Shipping (ABS) informs that it has entered into a new Memorandum of Agreement (MOA) establishing the policies and procedures regarding the

Rosneft Starts Up Field Work in the Kara Sea

On July 24 this year, research vessel Geolog Dmitry Nalivkin sailed from Kirkenes (Norway) to the Kara Sea. In the next three months 2D seismic survey, will

Seismic Vessel Tech

Geo-Science Provider TGS Reports Strong Half 2014 Results

TGS reports net revenues of USD 205 million in Q2 2014, compared to USD 210 million in Q2 2013. Earnings before interest and taxes (EBIT) totaled USD 82 million,

New Standard gets Revised Program for Cooper Basin Approved

New Standard Energy Limited (New Standard) advises that it has received approval for amendments to its five year work program in PEL570 in the Cooper Basin. As part of the revised program,

Rosneft Starts Up Field Work in the Kara Sea

On July 24 this year, research vessel Geolog Dmitry Nalivkin sailed from Kirkenes (Norway) to the Kara Sea. In the next three months 2D seismic survey, will

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Ship Electronics Ship Repair Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1805 sec (6 req/sec)