Blyth Workcat Joins Osiris Projects Survey Fleet

Posted by Michelle Howard
Wednesday, January 15, 2014
Proteus of Liverpool

A new 14-meter catamaran has been delivered to coastal survey specialists Osiris Projects by leading GRP workboat builders Blyth Workcats. The new boat, named Proteus of Liverpool, has been custom-built at the Blyth Workcats yard on Canvey Island, U.K., to provide a fast yet stable and comfortable working platform for coastal survey work. The boat has been fitted with a range of high specification sonar and acoustic positioning systems that will provide the company’s clients with high quality survey data enhanced by the stability of the new boat.

The Proteus is the fifth vessel in the Osiris Projects fleet and has MCA (Maritime and Coastguard Agency) category 2 approval to work up to 60 miles offshore. With a maximum design speed of 24 knots the new boat will be able to get quickly on station and commence surveying with minimum delay. The new survey boat will work primarily for oil and gas and offshore renewable clients, performing cable and pipeline pre- and post-installation route surveys around the coastline of the U.K. and Northern Europe.

The new vessel has been custom-built to include a moon pool to house a retractable sonar deployment system, a hydraulic A-frame and retractable transducer mounts and is capable of operating a full spread of survey sensors. With a spacious work cabin and sleeping for four the new boat also provides a comfortable working environment for surveyors and crew with ample space for topsides survey equipment.

The boat’s draft of just 1.1-meter also makes it ideal for working in the extreme shallows encountered during precision littoral survey contracts. With propulsion provided by two Cummins QSC 8.3 500-hp engines it possesses the power and maneuverability needed for safe operation in confined waters. The unique Blyth hull design also ensures exceptional handling and performance at both low and high speeds and incorporates a low drag profile ensuring excellent fuel economy.

The Blyth Workcats product range is noted for its exceptional value with highly competitive purchase prices. All are built from GRP to provide strength where it is needed and valuable weight savings wherever the design permits it.  Hull lamination and construction is governed by meticulous quality control so the customer can benefit from a boat that has been built to exactly meet their needs while enabling rugged strength and reinforcement to be applied wherever it is needed.

The strength yet comparatively light weight of a Blyth Workcats GRP hull also enables smaller engines to be used. This results in greater economy and higher speeds which, due to carefully designed hull profiles and chines, improve handling and sea-keeping in extreme conditions. Because GRP construction costs are significantly lower than those of metal-hulled catamarans, Blyth Workcat customers often find their budget going farther than expected. This may then enable them to invest in higher specification wheelhouse technology and interior accommodation than might otherwise have been possible. It is also noted that even after many years of hard use Blyth Workcats can be maintained to keep their good looks and shrug-off minor damage so that they maintain resale value while users retain their confidence in the condition and quality of these versatile craft. The Blyth Workcats range includes 17-, 14-, 12- and 10-meter catamarans that are built for a wide range of applications in addition to survey work. These can include wind farm support, passenger ferries, dive support, fishing charter or any of a wide range of workboat tasks.

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Long Beach Picketers Not Striking -Port CEO

Port of Long Beach CEO Jon Slangerup issued a statement addressing the status of picketing truckers at the harbor, pointing out that the demonstration is not a strike.

E-Procurement Streamlined via the Cloud

Marine Procurement Solutions (MPS) has built an electronic platform that aims to enhance the purchasing cycle for the maritime industry. MPS provides software,

IMO Forum Aims to Rebuild Somalia's Maritime Sector

A three-day Stakeholders Forum will be held April 27-29 to review draft guidelines for the establishment of a Somalia Maritime Administration, coordinated and funded

Offshore

BV Upgrades RAM Software

To help offshore operators and contractors get more out of their assets and develop projects more cost-effectively, Bureau Veritas has supercharged its reliability,

Intelligent Fender System Completes Offshore Trial

Strainstall, part of James Fisher and Sons plc, announced the completion of the world’s first Intelligent Fender System (IFS) trial with energy companies SSE and RWE at Suffolk-based wind farm,

Maritime Tension Dominates Southeast Asia Summit

Southeast Asian leaders edged closer to open criticism of China's land reclamation in the disputed South China Sea at a regional summit on Monday, as the Philippines

News

US Designates Three Marine Highway Projects

U.S. Transportation Secretary Anthony Foxx has designated three new Marine Highway Projects.   The Mississippi and Illinois Rivers, previously designated as the M-55 and M-35,

Long Beach Picketers Not Striking -Port CEO

Port of Long Beach CEO Jon Slangerup issued a statement addressing the status of picketing truckers at the harbor, pointing out that the demonstration is not a strike.

Baltic Index Flat on Muted Shipping Activity

The Baltic Exchange's main sea freight index, which tracks rates for ships carrying dry bulk commodities, remained flat on Monday on muted shipping activity.   The overall index,

Marine Equipment

ABB's New Azipod Thruster

ABB has released details on its latest generation Azipod thruster, a unit which ranges in power from 1.6 megawatts to 7 megawatts (MW) and is intended to serve a growing electric propulsion market.

Ecochlor BWTS

Ballast water treatment technology developer Ecochlor Inc. presented a project case study at CMA Shipping 2015, a case study which covered the retrofit of Ecochlor’s

GEA UV Ballast Water Treatment

Earlier this year GEA won the first contract for equipping cruise liners with its UV ballast water treatment system, BallastMaster marineX, powered by Trojan Marinex.

Vessels

BHGI-designed ATB Unit Under Construction

Bristol Harbor Group, Inc. (BHGI) informs it is currently completing the detail design phase of a 399’ x 74’ x 30’ 80,000 BBL double hull oil tank barge and a 120’

Scorpio Bulkers Sells Three Newbuilds for $111m

Scorpio Bulkers Inc. announced that it has entered into agreements to sell three newbuild dry bulk vessels, including two Capesize ships and an Ultramax ship, for

Horizon Delivers Second 80’ Towboat to FMT

Horizon Shipbuilding, Inc. announced the delivery of another 80’ Inland River Towboat, the M/V Chip Stiebing, to Florida Marine Transporters (FMT) of Mandeville, La.

Surveyors

Maritime Casualty Forum Held in Singapore

More than 250 shipping and insurance professionals gathered for the first ever Asian Maritime Casualty Forum held during Singapore Maritime Week.   The two-day conference,

Salvage and Wreck Removal Conference

HINODE Events and Services Pvt Ltd., have announced the 4th Annual Conference on Salvage and Wreck Removal in India to be held on Wednesday, July 8, 2015 at Visakhapatnam on India's East Coast.

KR Releases Writable Version of KR-CON Software

Korean Register (KR) – an IACS member classification society – has released a writable version of its KR-CON software and associated App to allow greater flexibility and enhance user experience.

 
 
Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Salvage Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.4268 sec (2 req/sec)