Keppel to Build New Drillship to its Proprietary Design

MarineLink.com
Wednesday, December 11, 2013

The CAN DO drillship will be the front runner in exploration, development and completion operations.

Following positive feedback and strong enquiries from the market, Keppel FELS Ltd (Keppel FELS), a wholly-owned subsidiary of Keppel Offshore & Marine Ltd. (Keppel O&M), is proceeding with the building of its new CAN DO drillship. When completed in 2016, the drillship is expected to be a state-of-the-art deepwater exploration, development and completion drilling vessel.

Chow Yew Yuen, Chief Operating Officer and CEO-Designate, Keppel O&M, commented, "As with all our market established proprietary designs, our new CAN DO drillship design was developed in close consultation with customers, major oil companies and vendors. The newly developed design is capable of handling next generation 20K psi blowout preventers.”

He continued, "While most modern drillships currently in operation were designed and built for exploration drilling, industry feedback has revealed the need for vessels capable of performing development and completion drilling in addition to exploration drilling. Since the launch of our design earlier this year, we have received very encouraging response from the market, and we have decided to start constructing the first drillship to this design. We believe the drillship meets the high functionality, safety and cost-effective requirements of the industry."

Jointly developed by Keppel Offshore & Marine Technology Centre (KOMtech), the R&D arm of Keppel O&M, and its design partner GustoMSC, Keppel's CAN DO drillship is designed to overcome the constraints of limited deck space found in most modern day drillships.

Apart from incorporating exploration drilling requirements, the design allows for the installation of third party equipment invariably required for development and completion drilling through the incorporation of a large functional deck space. In addition, the drillship has a double blowout preventer stack integrated into the design, and has a riser hold capacity meeting 12,000 feet water depth with the flexibility of storing either 75-foot or 90-foot long risers.

The drillship has been model tested at the MARIN facility in the Netherlands and has also obtained class approval for the basic design. A full 3D model has been created for construction purposes.

Keppel said a further announcement will be made once a firm contract has been secured for this drillship unit.

kepcorp.com
 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

World’s First LNG-Ready Ultra Large Container Ship Named

The race is on in global maritime circles to be the “world’s first” in every aspect of environmental friendliness, particularly in regards to the incorporation of LNG as fuel onboard commercial ships.

Wärtsilä Integrated Solutions for Maersk's AHTS Vessels

A new series of six Anchor Handling Tug Supply vessels to be built at the Kleven Verft AS in Norway for the Danish based Maersk Supply Service A/S - part of the A.

MacGregor Deck Equipment for Intership's Eco-bulkers

MacGregor, part of Cargotec, has secured a deck equipment contract from New Times Shipyard in China for Intership Navigation Co Ltd.'s three new 36,500 dwt laker-class bulk carriers.

Energy

MHI Completes Development of "Sayaringo STaGE"

Mitsubishi Heavy Industries, Ltd. (MHI) has completed development of the "Sayaringo STaGE," a next-generation LNG (liquefied natural gas) carrier. The Sayaringo

Drillsearch Discovers Gas at Varanus South-1

Drillsearch Energy Limited announced a new wet gas discovery on the Western Cooper Wet Gas Fairway of the Cooper Basin. The Varanus South-1 well in PEL 513 (Drillsearch

Gazprom to Partner Turkey to Supply Gas

Moscow hosted today a working meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Taner Yildiz, Minister of Energy and Natural Resources of the Republic of Turkey.

Naval Architecture

Production Begins on Sovcomflot’s New MPSV

Arctech Helsinki Shipyard started production of the new icebreaking multipurpose supply vessel   The production of the icebreaking multipurpose supply vessel

Glosten Designing Vigor’s Alaska Class Ferries

Glosten using Nupas-Cadmatic software for Vigor’s Alaska Class Ferry project   Seattle-based naval architecture consultancy Glosten has joined the list of North

Bollinger Delivers 11th FRC to the US Coast Guard

Bollinger Shipyards, Inc. has delivered the William Trump, the 11th Fast Response Cutter (FRC) to the United States Coast Guard.   The announcement was made by Bollinger Chief Operating Officer,

News

USCG Suspend Search for Crabber Near Anacortes, Wash.

The Coast Guard has suspended the search for a crabber reported overdue near Anacortes, Wednesday. Dean Harvey, 48, of Bremerton, remains missing. Search

Third Strike, Mansour Is Out

The M/V "MANSOUR M" with IMO number 7600586 has been banned for the 3rd time after subsequent detentions after the second refusal of access order in the Paris MoU region.

MHI Completes Development of "Sayaringo STaGE"

Mitsubishi Heavy Industries, Ltd. (MHI) has completed development of the "Sayaringo STaGE," a next-generation LNG (liquefied natural gas) carrier. The Sayaringo

Vessels

MHI Completes Development of "Sayaringo STaGE"

Mitsubishi Heavy Industries, Ltd. (MHI) has completed development of the "Sayaringo STaGE," a next-generation LNG (liquefied natural gas) carrier. The Sayaringo

MacGregor Deck Equipment for Intership's Eco-bulkers

MacGregor, part of Cargotec, has secured a deck equipment contract from New Times Shipyard in China for Intership Navigation Co Ltd.'s three new 36,500 dwt laker-class bulk carriers.

From Security to Efficiency Modern Vessel Tracking

More so than many other fields of business, the maritime industry is focused on cost, which in turn gives the appearance of being conservative towards technology.

Offshore Energy

Wärtsilä Integrated Solutions for Maersk's AHTS Vessels

A new series of six Anchor Handling Tug Supply vessels to be built at the Kleven Verft AS in Norway for the Danish based Maersk Supply Service A/S - part of the A.

Drillsearch Discovers Gas at Varanus South-1

Drillsearch Energy Limited announced a new wet gas discovery on the Western Cooper Wet Gas Fairway of the Cooper Basin. The Varanus South-1 well in PEL 513 (Drillsearch

Fourth Rig Delivered to Perforadora Central

Keppel AmFELS LLC, a wholly owned US subsidiary of Keppel Offshore & Marine Ltd (Keppel O&M), has delivered the jackup rig, Coatzacoalcos, to Mexico’s Central Panuco S.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Navigation Pipelines Pod Propulsion Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1576 sec (6 req/sec)