New Response Boat at Coast Guard Station Port Huron

MarineLink.com
Tuesday, August 27, 2013
The crew of Coast Guard Station Port Huron, Mich., test out their new 45-foot Response Boat-Medium in Lake Huron, Aug. 26, 2013. The crew officially accepted the RB-M, a more capable platform for search and rescue, Aug. 22, 2013. U.S. Coast Guard photo by Petty Officer 1st Class Bethannie Kittrell

The crew of Coast Guard Station Port Huron, Mich., began training on the station's new 45-foot Response-Boat-Medium, Monday after taking possession of the boat last Thursday.

The RB-M can respond faster than previous boats of similar size with a top speed in excess of 40 knots, has advanced search capability with an installed forward-looking infrared search technology, the Coast Guard said. Additionally, with twin jet propulsion, the vessel is able to respond in shallower water.

"We are excited to bring a new and improved boat to the Blue Water Area," said Chief Petty Officer Kevin J. Stryker, officer-in-charge of Station Port Huron. "This new 45-foot response boat will replace the aging 41-foot Utility Boat, greatly enhancing the Coast Guard's capabilities and response time and allowing us to better serve the public."

The boat has a deep-V double-chine hull, which provides a balance of performance and stability. The vessel is also self-righting; if it capsizes in rough seas, the boat is designed to roll back over.

It can handle heavy seas and waves up to 12 feet and carry up to 24 people.

The RB-M is being added to Station Port Huron's current craft complement, consisting of the 41-foot UTB and one 25-foot Response Boat-Small.

With a top speed of more than 40 knots, the highly capable RB-M allows crews to arrive on scene faster. Station Port Huron's crew will continue to use the UTB as the RB-M becomes fully operational and all crewmembers are qualified. Right now, plans are to continue using the UTB until it is removed from the water for the Great Lakes ice season, at which point it will be divested.

The RB-M was built by Marinette Marine in Marinette, Wis.

uscgnews.com

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Workboats

Shipping Season Opens on the Mississippi

First tow marks unofficial opening to Mississippi River navigation season   M/V New Dawn arrived at Lock and Dam 2 near Hastings, Minn. Wednesday morning, marking

Two ASD Tugs Delivered to URAG

URAG has taken delivery of two ASD 2411 Tugs to add to its existing fleet. Named Brake and Perfect, the new vessels have joined their sister ship Prompt in the

Plans in Place to Test Intermodal River Transport

The Paducah-McCracken County Riverport Authority and Ingram Barge Company has announced plans to assess the viability of Intermodal River Transportation, utilizing

Education/Training

Austal Graduates 48 4-Yr Apprentices

Austal USA combined two classes to graduate a total of 48 members of Austal’s cutting-edge four-year apprenticeship program yesterday at a formal ceremony held at the Arthur R.

SimCity

Building Capacity, as Deadline for Trained Crews Nears   “You see that ship. That’s our ship,” says Karsten Saevik, as he directs our attention to the virtual

Maritime Training Five Years from Now: A Look Ahead

For anyone involved in maritime training, now is an incredibly exciting time full of opportunity. More than ever before, there are new advanced techniques and technologies

News

Gulf Bridge Express Service to End

The Gulf Bridge Express Service will shortly be terminated with the last roundtrip voyage being MV Saint Nikolaos voyage 00008S, ETA New Orleans on April 22, 2015.

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

Coast Guard

USNS Spearhead Delivers Materials to Ghana Charities

The U.S. Navy’s joint high-speed vessel USNS Spearhead (JHSV 1) delivered wheelchairs and medical supplies to Ghanaian non-governmental organizations March 26, 2015.

USCG Flush Ice down River Systems to Facilitate Shipping

The Coast Guard cutter fleet is flushing ice through the Great Lakes river systems to prevent ice jams and facilitate commercial shipping as the shipping season

Mediterranean Rescue Operations Strain Shipping

The Wall Street Journal ran a story yesterday describing how the increasing number of seaborne migrants making the journey from Africa to Europe has not only

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Salvage Ship Repair Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1405 sec (7 req/sec)