Second Sentinel-Class Cutter Contract Option Awarded

Friday, September 17, 2010
The lead Sentinel-class FRC, the Bernard C. Webber, under construction at Bollinger Shipyards. U.S.Coast Guard Photo

The Coast Guard awarded a $166.1m contract option to Bollinger Shipyards of Lockport, La., on September 14 to begin production of four Sentinel-class Fast Response Cutters (FRCs).  This option award brings the total number of FRCs under contract with Bollinger to eight with a current contract value of $410.7 million.  The current FRC contract contains options for up to 34 cutters and is worth up to $1.5 billion if all options are exercised.

In September 2008, the Coast Guard awarded Bollinger an $88m production contract for the lead FRC.   That ship, named the Bernard C. Webber, is approximately 70% complete and expected to be delivered to the Coast Guard in the third quarter of fiscal year 2011.  The Bernard C. Webber will be homeported in Miami, Fla., supporting vital law enforcement and national security missions throughout the Caribbean and Gulf of Mexico.   

This first contract option, for construction of three more FRCs, was awarded to Bollinger in December 2009; those ships are currently under construction at Bollinger’s shipbuilding facility in Lockport.  The second FRC is approximately 40% complete; FRCs three and four are 15% and 1% complete, respectively.

The Sentinel-class will eventually replace the Coast Guard’s Island-class 110-ft patrol boat.  The FRC uses a proven, in-service parent craft design based on the Damen Stan Patrol 4708.  It has a required flank speed of 28 knots and will be armed with one stabilized, remotely-operated 25mm chain gun and four crew-served .50 caliber machine guns.  Other requirements include the ability to perform independently for a minimum of five days at sea and capable of underway operations for a minimum of 2,500 hours per year.  It will use state-of-the-market command, control, communications and computer technology that will be interoperable with the Coast Guard’s existing and future assets, as well as Department of Homeland Security and Department of Defense assets.  The cutter will also meet American Bureau of Shipping design, build and class standards.  The Coast Guard plans to build 58 FRCs. 

Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


MECNW Appoints New CEO

Terry Weston has been confirmed as Chief Executive of Maritime and Engineering College North West (MECNW) following the retirement of his predecessor, Jim Teasdale, at the end of September.

MacGregor's Deck Machinery for Sentinel Marine ERRV

MacGregor, part of Cargotec, will supply deck machinery for a new 65m emergency rescue & response vessel (ERRV) for Sentinel Marine. The ship has been designed

Maersk to Install Inmarsat's Entertainment Service

The leading provider of global mobile satellite communications services, today announced that Maersk Tankers, the owner and operator of one of the world’s largest fleets of product tankers,


Towering Damen Marine Components Hits 150‏

Damen Marine Components (DMC), the oldest company in Damen Shipyards Group, celebrates its 150th anniversary today. DMC has grown from a very small shipyard established in Gorinchem in 1865,

Azerbaijan to Get New Passenger Vessel This Year-end

Azerbaijan Caspian Shipping Company  expects to get the first of the three passenger vessels being built currently at the Baku Shipbuilding & Repair Plant (Baku Shipyard LLC) until the end of 2015,

Michelle Obama to Christen Navy's Newest Submarine

U.S. First Lady Michelle Obama will join builder General Dynamics Electric Boat, a wholly owned subsidiary of General Dynamics, in christening Illinois (SSN-786), the U.

Coast Guard

USCG Search for Missing Crew of El Faro

Coast Guard search and rescue crews continue searching for possible survivors from the cargo ship El Faro Monday night, covering a total search area of more than 160,574 square nautical miles.

USCG: Missing Cargo Ship El Faro Believed to Have Sunk

The U.S. Coast Guard now believes that the missing cargo ship El Faro sank after sailing into the path of Hurricane Joaquin in the Bahamas, a spokesman said on Monday.

Man Medevacs from Boxship Off Santa Rosa Island

The Coast Guard medically evacuated a 46-year-old man from a 738-foot container ship approximately 6 miles south of Santa Rosa Island, Sunday. At 10:01 a.

Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1475 sec (7 req/sec)