Brazil Offshore Shipbuilding 'Center of Excellence' Planned

Press Release
Thursday, May 09, 2013

Petrobras plans to build the center, which is intended to help shipbuilders meet the company's pre-salt oil & gas exploration needs.

The plans to build a center of excellence for the shipbuilding industry in Brazil were highlighted in the presentation made by Paulo Sergio Rodrigues Alonso, Petrobras Local Content Advisor to the President and the Executive Coordinator of Prominp, during an event sponsored by the Brazil-Texas Chamber of Commerce (Bratecc), in Houston, an event occurring in parallel with the recent Offshore Technology Conference (OTC).

Paulo Alonso stressed that the biggest challenge today is to push the pre-salt forward in the shipbuilding industry and the shipyards. "NASA's slogan is well-fitting in this situation 'Failure is not an option'. We are working with the shipyards so that we can meet the demand and stay on track with the schedule defined in our Business Plan, they cannot fail. There are many challenges in achieving a benchmark in the shipbuilding industry, and partnerships with international companies and Universities are absolutely essential."



The average local content in Petrobras' exploration and production operations today is between 55% and 65%. "For the other 35% we need the support of international companies so we can develop our projects. We understand that the association with international companies is the best solution for technological bottlenecks, in addition to working in partnership with universities to achieve long-term results", he explained.



Paulo Alonso highlighted the growth in demand for goods and services for the shipbuilding industry over the next five years. "All Petrobras contracts are based on international standards, so we know the cost of the equipment and services within the project."

He also highlighted Petrobras local content policy, the Prominp (National Mobilization Program of the Petroleum Industry) and the importance of the Brazilian shipbuilding industry's growth. "While oil and gas production continues to grow with the development of the pre-salt, investment opportunities and partnerships in the sector will continue to grow for investors in the entire oil supply chain. Due to the operations in the pre-salt and the magnitude of our business plan, perspectives and specifics of deepwater exploration, we cannot use off-the-shelf equipment, we need to develop technology and equipment to meet this demand."

However he concluded: "International companies interested in establishing themselves in Brazil are welcome and will work in partnership with Brazilian companies, or even by themselves."

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

FMT Orders Another Towboat from Eastern Shipbuilding

Eastern Shipbuilding Group, Inc. is pleased to announce that Florida Marine Transporters, Inc. of Mandeville, LA exercised another additional 90’x32’x10’ “Canal

ClassNK Completes Work on KOTC Vessel

ClassNK announced that it has completed work on the 31,445GT Product Tanker MUTRIBA, built by Hyundai Mipo Dockyard Co., Ltd. (HMD) as part of a series of vessels

VT Halter Begins Building LNG-powered ConRo Ships for Crowley

VT Halter Marine, Inc., a subsidiary of Vision Technologies Systems, Inc. (VT Systems), has commenced construction on the first of two liquefied natural gas (LNG)-powered,

Offshore

Nordic Wins with Noble

Nordic Maritime, a leading offshore service operator, today announced a five year time charter for its DP2 IMR Subsea vessel, Mokul Nordic, which has been awarded by Noble Energy,

Pemex Suspends Eviction of Workers in Campeche

Due to the behavior shown by the low pressure system in the Gulf of Mexico, whose career was diverted in the last hours, the Technical Analysis Group Emergency

Renewable Energy: Schottel Tidal Turbines Ready For Use

In the last months Schottel  successfully tested its hydrokinetic turbines in Strangford Lough, Northern Ireland. The full-scale tests included 260 operating hours under realistic conditions.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Pipelines Pod Propulsion Salvage Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1208 sec (8 req/sec)