Russian Shipyard to Deliver Warship to Indian Navy

Press Release
Wednesday, October 03, 2012
'INS Tarkash': Photo credit Yantar Shipyard

Frigate 'INS Tarkash' under construction at the Yantar shipyard in Kaliningrad is due to be handed over to the Indian Navy next month.

INS Tarkash is the second Talwar-class ship being built for Indian Navy under a contract signed in 2006.

Frigates of this class are designed for anti-submarine, surface ship warfare, as well as air defence.

Length of the ship is 125 meters; beam is 15 meters; displacement is about 4,000 tons; full speed is 30 knots; cruising range at 14 knots is 5,000 nautical miles; crew strength is over 200 men including 20 officers.

Yantar shipyard won the tender for three such frigates and began construction of the lead ship INS Teg in the summer of 2007. Afterwards, building of other ships started – frigate INS Tarkash (laid down in Nov 2007, launched in 2010) and INS Trikand (laid down in June 2008, launched in May 25, 2011).

First three Project 11356 frigates were built by Baltiysky Zavod shipyard (St. Petersburg) in 1999-2004, commissioned into Indian Navy and are currently in service.

The second trio of frigates has different armament. In contrast to the first frigates armed with Club-N missile system, ships built by Yantar have BrahMos missile systems jointly developed by Russia and India.







 

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Imabari to Build 20,000TEU Containerships

Imabari Shipbuilding Co., Ltd. announced it has secured newbuild orders with the cooperation of Marubeni Corporation for 11 units of 20,000TEU Ultra-Large Container Carriers,

SSI Launches ShipConstructor 2015 R2.1

SSI has today released ShipConstructor 2015 R2.1 software.   The software release comes in response to emerging ship design, engineering and building trends as

HII Acquires Engineering Solutions Division

Huntington Ingalls Industries (HII) has acquired the Engineering Solutions Division of The Columbia Group, a designer and builder of unmanned underwater vehicles

Navy

HII Acquires Engineering Solutions Division

Huntington Ingalls Industries (HII) has acquired the Engineering Solutions Division of The Columbia Group, a designer and builder of unmanned underwater vehicles

NASSCO to Christen Third MLP, Lewis B. Puller

Shipbuilder General Dynamics National Steel & Shipbuilding Co. – NASSCO – will christen the USNS Lewis B. Puller (MLP 3 AFSB) Saturday, February 7, 2015 in San Diego.

ThyssenKrupp: Submarine Unit Not For Sale

German industrial group ThyssenKrupp is not in talks to sell its submarine unit nor is it in talks to sell its stainless steel unit VDM, its chief executive said on Friday.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Port Authority Salvage Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1568 sec (6 req/sec)