Singapore's Second Cruise Terminal Set to Welcome First Ship

Press Release
Thursday, May 24, 2012
'Voyager of the Seas': Photo credit Wiki CCL

Later this month Singapore's new cruise ship passenger terminal will see its first ship arrive

The 28,000-square-meter terminal, which was built at a cost of 500 million Singapore dollars (400 million U.S. dollars) and operated by the SATS-Creuers Cruise Services, will effectively double Singapore's berth capacity.

The terminal has the capability to dock ships of up to 220,000 gross register tonnage (GRT) and measuring up to 360 meters in length with a hull draft of up to 11.5 meters. It also has a spacious arrival and departure hall comprising 80 check-in counters and up to 40 immigration counters, as well as a large ground transportation area, which allow the handling of up to 6, 800 passengers at any one time.

The 138,000-ton Voyager of the Seas will dock for the first time in Singapore at the new terminal. With a capacity of 3,840 passengers and 1,176 crew, it is the largest ever to homeport in Singapore.

Melvin Vu, chief executive officer of the SATS-Creuers Cruise Services, said the company will be trying to have passengers disembark from their ships and leave the terminal swiftly to continue on with their holiday itinerary, as cruise terminals are built to cater to large numbers of passengers in a short period of time.

"The opening of the Marina Bay Cruise Centre Singapore marks a momentous development for the cruise industry in Singapore and we look forward to receiving guests from all over the world," he said. "Singapore's strategic location coupled with the terminal's state- of-the-art facilities and proximity to the city and Singapore Changi Airport will anchor the country's position as Asia's leading cruise hub."

 

 

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

Dortmund Port's Throughput Up

In 2014, Dortmund’s combined goods throughput on ships and trains amounted to 5.7 million tonnes, compared to 5.3 in the previous year. 2.9 million tonnes (+600,000) of this was ship related.

Baltic Mercur II makes maiden voyage to Antwerp

This week Atlantic Ro-Ro Carriers (ARRC) celebrates the maiden voyage of the Baltic Mercur II via the port of Antwerp as part of their regular transatlantic service to the US Gulf.

Vinalines Plans Ports Divestment

The Vietnam National Shipping Lines (Vinalines) and the Ministry of Transport (MOT) hope the plan to reduce the state’s ownership ratio in the big shipping firm

 
 
Maritime Security Naval Architecture Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1200 sec (8 req/sec)