Singapore's Second Cruise Terminal Set to Welcome First Ship

Press Release
Thursday, May 24, 2012
'Voyager of the Seas': Photo credit Wiki CCL

Later this month Singapore's new cruise ship passenger terminal will see its first ship arrive

The 28,000-square-meter terminal, which was built at a cost of 500 million Singapore dollars (400 million U.S. dollars) and operated by the SATS-Creuers Cruise Services, will effectively double Singapore's berth capacity.

The terminal has the capability to dock ships of up to 220,000 gross register tonnage (GRT) and measuring up to 360 meters in length with a hull draft of up to 11.5 meters. It also has a spacious arrival and departure hall comprising 80 check-in counters and up to 40 immigration counters, as well as a large ground transportation area, which allow the handling of up to 6, 800 passengers at any one time.

The 138,000-ton Voyager of the Seas will dock for the first time in Singapore at the new terminal. With a capacity of 3,840 passengers and 1,176 crew, it is the largest ever to homeport in Singapore.

Melvin Vu, chief executive officer of the SATS-Creuers Cruise Services, said the company will be trying to have passengers disembark from their ships and leave the terminal swiftly to continue on with their holiday itinerary, as cruise terminals are built to cater to large numbers of passengers in a short period of time.

"The opening of the Marina Bay Cruise Centre Singapore marks a momentous development for the cruise industry in Singapore and we look forward to receiving guests from all over the world," he said. "Singapore's strategic location coupled with the terminal's state- of-the-art facilities and proximity to the city and Singapore Changi Airport will anchor the country's position as Asia's leading cruise hub."

 

 

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

EUROPA 2 Undergoes First Scheduled Docking

As part of its first scheduled docking, Hapag-Lloyd Cruises’ EUROPA 2 underwent technical maintenance at Blohm + Voss in Hamburg from April 11-24, 2015.   At the same time,

SCHOTTEL to Present Inland Offerings

SCHOTTEL will present its expertise to the U.S. inland market at the upcoming Inland Marine Expo in St Louis, June 15-17, 2015: strong push boats in Brazil, big

SCH Services Anthem of the Seas in Southampton

Terminal operators Southampton Cargo Handling (SCH) are utilizing their considerable experience in handling cruise vessels to service the biggest cruise ship to call in the port of Southampton.

Ports

5th Floating Accommodation for Lerwick

A further accommodation ship, Ocean Atlantic, is due at Lerwick on Monday 27 April 2015 and is on its way from Portland in Dorset. As with the other floating accommodation at the port,

Double Order for Super Gloria Reachstacker

Kalmar, part of Cargotec, has gained an order for two Super Gloria reachstackers from Tadarsa Logistics S.L. in Aviles, Spain. The largest reachstackers ever built,

APM Maasvlakte II Terminal Opens

APM Terminals Maasvlakte II held a ceremony  to celebrate the opening of the world’s most automated container terminal.   The  event that was attended by Dutch

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1140 sec (9 req/sec)