Aker Solutions Wins Drilling Equipment Contracts

Wednesday, April 20, 2011

Aker Solutions signed two contracts with Daewoo Shipbuilding & Marine Engineering (DSME) for the delivery of complete drilling equipment packages for two new deepwater drillships. The contracts have a total value of about $230m.
The drilling equipment and systems will be installed on the two vessels, which are being constructed at DSME's yard in South Korea.  Each delivery has a contract value of about $115 million, and includes options for additional equipment and services.
"We are very pleased to supply another pair of Aker Solutions' drilling equipment packages to DSME and its clients," says Thor Arne Håverstad, executive vice president of Aker Solutions' drilling technologies business.
The drillship deliveries are scheduled for Q4 2013. The majority of the equipment will be delivered in 2012.
Aker Solutions will handle all major aspects of the delivery, from engineering and procurement to installation and commissioning. 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

President Pryor Retires from ExxonMobil Chemicals

Stephen D. Pryor, president, ExxonMobil Chemical Company and vice president of Exxon Mobil Corporation, has elected to retire on January 1, 2015, after more than 44 years of service.

Offshore

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Marine Equipment

ST Engineering Rejigs Top Deck

Singapore Technologies Engineering Ltd (ST Engineering) today announced the appointment of senior management personnel to new key management positions in the

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Sea Star Line: Equipment Replacement Plan on Track

Company Receives New Refrigerated Containers and Places Order for New Genset Equipment   Sea Star Line, LLC began receiving the first of its new 100 40’ and 45’

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1134 sec (9 req/sec)