Structural Integrity NDT Test for Deepwater Fiber Rope Connectors

Tuesday, January 18, 2011

First Subsea is using innovative non-destructive testing (NDT) technology to inspect the quality of forgings used in the new range of LankoFirst fiber rope connectors for deepwater moorings.
Process Compensated Resonance Testing (PCRT) undertaken by Vibrant NDT Ltd is reportedly the only NDT technology to correlate to the structural integrity of the inspected component.
The LankoFirst fiber rope mooring connector is designed to revolutionize the ease with which deepwater fiber mooring lines for rope-rope, rope-wire and rope-chain connections are deployed offshore. Developed specifically for deepwater fiber connections, the connectors are smaller, lighter, stronger and more efficient than current plate links and thimbles for the same MBL.
Ease of make-up offshore is enabled by splicing the Lankofirst's sub-connector to the rope end during rope manufacture. It is this donut-shaped subconnector that is being tested using PCRT.
Briefly, during PCRT the subconnector is excited with minute, through thickness vibrations generated by dry coupled piezoceramic transducers, from a continuous swept sine frequency input. The resonant spectra of the excited components is then logged permanently in a digital library and compared to spectras from known good and defective sub-connectors.
PCRT measures the variations in resonance signatures that are the result of variations in structural integrity. In this way the PCRT software "learns" the acceptable manufacturing variations as well as the unacceptable variations caused by material problems, process problems, and in-process damage.

Resonance Test 'Fingerprint'
In addition the PCRT technique can be used to compare a component's resonance signature before use, during (as part of an inspection routine) and after use, and thus monitor the connector's structural intergrity for the onset of fatigue before cracking has begun. 
“The PCRT technique gives us a method of assessing the structural integrity of deepwater fiber rope mooring connectors that simply hasn't existed until now. For the first time operators and installers are able to specify levels of structural intergrity in mooring line connectors that reflect the demands of long-term, deepwater mooring,” said Brian Green, general manager, First Subsea Ltd.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Keppel FELS Delivers 11th Jackup to Mexico

Keppel FELS Limited (Keppel FELS), a wholly owned subsidiary of Keppel Offshore & Marine Ltd (Keppel O&M), has delivered a KFELS B Class jackup rig to Mexican national oil company,

North Sea Oil: Harkand wins Maersk Oil North Sea Deal

Harkand won a multi-million contract with Maersk Oil North Sea Ltd for the provision of DSV services in the North Sea region. The 12-month contract will be serviced by Harkand’s two DSVs,

China's Air Drills Roil South China Sea Waters

China's air force conducted its first drill above the western Pacific Ocean on Monday, the Defence Ministry said, in a move that could exacerbate tensions with

 
 
Maritime Careers / Shipboard Positions Naval Architecture Pipelines Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1698 sec (6 req/sec)