Marine Link
Thursday, September 29, 2016

Three Hopper Barges for Van Oord

January 23, 2008

Vosta LMG in The Netherlands has been awarded a contract for the delivery of a complete engineering and component package for 3 hopper barges for Van Oord in The Netherlands. The complete order consists of the design and engineering of 10.000 m3 hopper barges, including the delivery of the bottom doors, electrical-, and hydraulic installation. The hopper barges are fitted with a hydraulic bottom door system and a special coupling system for the pusher tug. The barges will be built at COSCO shipyard Dalian, China. Installation and assembly of all critical components will be under VOSTA LMG supervision. Where possible, components are supplied through Chinese manufacturers with the assistance of the VOSTA LMG office in Zuhai. VOSTA LMG will also supply supervision during construction and assembly. The hopper barges will be available in the summer of 2008 after which they will be transported to Dubai, where they will be used as sand transport barges.


Maritime Reporter Magazine Cover Sep 2016 - Maritime & Ship Security

Maritime Reporter and Engineering News’ first edition was published in New York City in 1883 and became our flagship publication in 1939. It is the world’s largest audited circulation magazine serving the global maritime industry, delivering more insightful editorial and news to more industry decision makers than any other source.

Subscribe
Maritime Reporter E-News subscription

Maritime Reporter E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for Maritime Reporter E-News