Control Systems on LCC 20 Saves Fuel, Reduces Workload

By Joseph Battista, NSWCCD-SSES Public Affairs
Tuesday, June 04, 2013

Naval Sea Systems Command completed the installation of new control systems aboard USS Mount Whitney (LCC 20), April 8, which will reduce fuel usage and crew workload.  
Engineers from the Naval Surface Warfare Center Carderock Division - Ship Systems Engineering Station (NSWCCD-SSES) SSES installed the new control systems on a number of shipboard engineering components and are specifically designed to improve automation on the optimally manned ships. “Military Sealift Command-operated ships like the Mount Whitney traditionally have lower manning levels, therefore being able to operate many systems from one central control unit is essential,” said Matthew Douglass, Auxiliary Machinery Automation Branch head. “The automation of the controls greatly improves the quality of life for the professional engineers aboard.”
Todd Woltjen, mechanical engineer with Auxiliary Machinery Automation Branch who coordinated and oversaw the upgrades, said the improved automation saves money by reducing fuel consumption and lowering the electricity used.
“For example, upgrading the main engine lube oil pressure system from constant two speed pumps to variable speed drives allows the pumps to throttle at speeds between 10-100 percent,” said Woltjen.  “This ability uses less electricity and maintains more stable pressure, which saves money.”
According to Woltjen, limitations in automation when the ship was built did not allow for optimization of the fuel-to-air mixture used in boiler combustion. This caused excess air in the combustion process and resulted in higher fuel consumption.
“With current automation we can accurately measure more processes such as combustible gases,” said Woltjen. “We can integrate data into more powerful [programmable logic controllers] to optimize the fuel/air mixture and reduce excess waste heat up the stack, ultimately using less fuel.”
Mount Whitney’s control systems were upgraded over three weeks from late March to early April during the ship’s availability at the San Giorgio Del Porto shipyard in Genoa, Italy.  The Ship Systems Engineering Station, Philadelphia, is a major component of Naval Surface Warfare Center Carderock Division and a field activity of the Naval Sea Systems Command. It is the Navy’s principal test and evaluation station and in-service engineering agent for all hull, mechanical and electrical ship systems and equipment, and has the capability to test and engineer the full range of shipboard systems and equipment from full-scale propulsion systems to digital controls and electric power systems.

 

(As published in the May 2013 edition of Maritime Reporter & Engineering News - www.marinelink.com)

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Ecospeed Fuel and Cost Saving Solutions at SMM

Ecospeed announced it will exhibit its line of fuel and cost saving solutions at SMM in Hamburg. Ecospeed and fuel savings Routine in-water cleaning results

Lamprell First Half Results Beat Expectations

Lamprell today announced its financial results for the first half of 2014, reporting results ahead of expectations due to strong operational performance and early results from savings initiatives,

Kiel Port Growth Continues

Cargo and passenger handling rise by 3%. Handling in the Port of Kiel continued to grow in the first half of the year. A total of 3.24 million tons of cargo

News

Lamprell First Half Results Beat Expectations

Lamprell today announced its financial results for the first half of 2014, reporting results ahead of expectations due to strong operational performance and early results from savings initiatives,

Kiel Port Growth Continues

Cargo and passenger handling rise by 3%. Handling in the Port of Kiel continued to grow in the first half of the year. A total of 3.24 million tons of cargo

HMS Prince of Wales Hull Departs for Rosyth

A huge section of hull for HMS Prince of Wales, the second Queen Elizabeth Class aircraft carrier, has today begun its delivery voyage from HM Naval Base Portsmouth

People in the News

Coast Guard Responds to Capsized Tug in Chicago

The Coast Guard is responding to the capsizing of a tug on the Calumet River near the 106th St. Bridge in Chicago in which two crew members were able to escape and swim to shore.

UK's Hound Point VLCC Jetty Down Until Sept. 15

The supertanker jetty at the North Sea's Hound Point crude oil terminal is shut for maintenance and will not reopen until Sept. 15, operator BP Plc said on Thursday,

Joint Petroleum Development in South China Sea Makes Sense

Shared development of oil, gas and possibly other natural resources is the most promising option for reducing tensions in the South China Sea and should be the

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Port Authority Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2654 sec (4 req/sec)