GD Bath Iron Works Awarded Zumwalt-class Modules Contract

MarineLink.com
Monday, August 05, 2013
Rendering courtesy of GD

The U.S. Navy has awarded General Dynamics Bath Iron Works a $212-million contract for design and construction of a steel deckhouse and hangar and construction of aft Peripheral Vertical Launching System (PVLS) modules for integration into 'Lyndon B Johnson' (DDG 1002), the third ship of the U.S. Navy's 'Zumwalt-class' of guided missile destroyers.

The Zumwalt-class deckhouse includes the ship's bridge, radars, antennas and intake/exhaust systems in a structure with a significantly smaller radar cross-section than other ships in the modern Navy fleet.  The enclosed hangar is designed to accommodate two medium-lift helicopters or other mission-related equipment.  The PVLS modules distribute the ship's missile launchers in separate four-cell launcher compartments along the ship's hull.

There are currently three DDG 1000 class destroyers in production at Bath Iron Works, Zumwalt (DDG 1000), Michael Monsoor (DDG 1001) and Lyndon B. Johnson (DDG 1002).  Zumwalt is scheduled to be delivered to the Navy in 2015.  The keel laying ceremony for DDG 1001 took place in May 2013 and Start of Fabrication for DDG 1002 was in April 2012.

"The design and production of these critical components of DDG 1002 will help maintain our specialized engineering and design skills and provides additional stability to our manufacturing workload," said Jeff Geiger, president of Bath Iron Works.  "We are pleased to have been selected for this important work."
 

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Bahri Orders VLCC Newbuilds

Bahri ordered five newbuild very large crude carriers from Hyundai Samho Heavy Industries   The National Shipping Company of Saudi Arabia (Bahri) today signed

Scandlines Orders Ferry Battery System

Corvus Energy announces the signing of marine Energy Storage System (ESS) contract with Scandlines Denmark ApS; world’s largest battery hybrid electric fleet orders additional 2.

Mercury Diesel Engines for 16 New USCG Boats

Mercury Marine has entered an agreement with Metal Shark Aluminum Boats to power 16 U.S. Coast Guard (USCG) boats with Mercury diesel engines.   “Mercury Marine’s 2.

Shipbuilding

Bahri Orders VLCC Newbuilds

Bahri ordered five newbuild very large crude carriers from Hyundai Samho Heavy Industries   The National Shipping Company of Saudi Arabia (Bahri) today signed

Construction Starts on Crowley’s 2nd LNG ConRo Ship

Construction begins on Crowley’s second Commitment Class, LNG-powered ConRo ship for use in the Puerto Rico trade   Shipbuilder VT Halter Marine, Inc. has officially

Scandlines Orders Ferry Battery System

Corvus Energy announces the signing of marine Energy Storage System (ESS) contract with Scandlines Denmark ApS; world’s largest battery hybrid electric fleet orders additional 2.

Navy

HHI Launches Korea’s Second Minelayer

Shipbuilder Hyundai Heavy Industries (HHI) launched the second minelayer, MLS-II Nampo, for the Korean Navy.   In attendance at the MLS-II launching ceremony were Baek Seung-joo,

Philippine, Vietnamese Troops Together on Disputed Island

Vietnamese and Philippine troops played soccer and sang karaoke on a South China Sea island on Wednesday in a sign of the growing security ties between the two

Hundreds Rally in Myanmar over "boat people" Crisis

Hundreds of protesters marched through the streets of Myanmar's largest city of Yangon on Wednesday to denounce foreign criticism of the country's treatment of stateless Rohingya Muslims.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Offshore Oil Pod Propulsion Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1625 sec (6 req/sec)