Marine Link
Friday, October 21, 2016

CSL Niagara Christened

August 2, 1999

The largest-ever Canadian ship built for the Great Lakes-St. Lawrence was blessed at a ceremony last June at the Lake Ontario entrance to the Welland Canal at Port Weller Drydocks. The vessel is the newest member of the Canada Steamship Lines (CSL) fleet, and the first of a trio of ships to be constructed by Port Weller as part of a $100 million fleet reinvestment program by CSL. Measuring 740 x 78 x 48, the newbuild required more than 6,000 tons of steel. This grand project also included the construction of a new hull, which was joined to the engine room portion of the J.W. McGiffin. Featuring the most advanced self-unloading system available, the Niagara is the premiere ship to be built to the St. Lawrence Seaway's new maximum-size allowances.

Maritime Reporter Magazine Cover Oct 2016 - Marine Design Annual

Maritime Reporter and Engineering News’ first edition was published in New York City in 1883 and became our flagship publication in 1939. It is the world’s largest audited circulation magazine serving the global maritime industry, delivering more insightful editorial and news to more industry decision makers than any other source.

Maritime Reporter E-News subscription

Maritime Reporter E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for Maritime Reporter E-News