Final Section of Giant Aircraft Carrier Sets Sail

MarineLink.com
Monday, June 17, 2013

The final section of HMS Queen Elizabeth, the first of two new aircraft carriers being built for the U.K. Royal Navy, has left BAE Systems’ shipyard at Scotstoun today to embark on a 600 mile journey to Rosyth.

The Aft Island, also known as Upper Block 14, is the air traffic control tower of the ship and the center of all flight operations. Travelling around the north coast of Scotland, the block is scheduled to arrive into Rosyth on Thursday 20 June. Once the island has arrived all sections of the first of class HMS Queen Elizabeth will have been delivered.

Angus Holt, Queen Elizabeth Class Block Delivery Director for BAE Systems, said, “The delivery of the Aft Island is a huge milestone for the aircraft carrier program and we are extremely proud to have achieved this. The island has been completed to an exceptional standard which is testament to the skills and talent of our workforce here on the Clyde.

“Once the island has arrived in Rosyth the full scale of the nation’s flagship ship will be revealed for the first time.”

Weighing 750 tons, the Aft Island was carried onto a sea-going barge on June 11. Preparations were then made over five days to secure the structure to the barge ahead of her departure from Scotstoun for the delivery voyage. On arrival in Rosyth the island will be lifted onto the flight deck of HMS Queen Elizabeth by the giant Goliath Crane.

The build of the Aft Island was completed ahead of schedule in just 86 weeks from the first steel cut to the completed block being loaded onto the barge. Housing 110 compartments, the island is over 30 meters tall and contains more than 44,000 meters of cable.

HMS Queen Elizabeth is the first aircraft carrier to use an innovative design of two islands. The Forward Island has already been erected onto the flight deck of the ship in Rosyth and houses the main bridge. Both islands are designed with the ability to incorporate the other’s role in an emergency, thus increasing the survivability of the ship.

The aircraft carriers HMS Queen Elizabeth and HMS Prince of Wales are being delivered by the Aircraft Carrier Alliance, a unique partnering relationship between BAE Systems, Thales U.K., Babcock and the U.K. Ministry of Defense.

The QE Class will be the centerpiece of Britain’s military capability. Each 65,000-ton aircraft carrier will provide the armed forces with a four acre military operating base which can be deployed worldwide. The vessels will be versatile enough to be used for operations ranging from supporting war efforts to providing humanitarian aid and disaster relief.

www.baesystems.com
 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Ingram Barge Order 20 Tank Barges for 2015

Ingram Barge Company say they will be building 20 tank barges in 2015 to meet growing demand for chemical shipments. While most of the company’s recent tank barges have come through acquisitions,

ClassNK Issues New Rules for Inland Waterway Ships

Leading classification society ClassNK has released new technical rules and guidance for the survey and construction of inland waterway ships. As a result

Steel Cut for Third RCI Quantum-class Cruise Ship

The steel cutting for 'Ovation of the Seas', scheduled to be delivered in the autumn of 2016, took place at the Meyer Werft shipyard in Papenburg, Germany, where 'Quantum of the Seas',

Navy

AN/SPY-1 SSSA Completes Critical Design Review

The Critical Design Review (CDR) stage for AN/SPY-1 radar Solid-State Switch Assembly (SSSA)'s high voltage modulator completed Aug. 26, confirming that the

General Dynamics Wins US Navy Award for F/A-18 Mission Computers

General Dynamics Advanced Information Systems, a business unit of General Dynamics, was awarded a $16.2 million contract by the U.S. Navy to produce Type-3 Advanced

Phoenix International Awarded US$75-M Subsea Navy Contract

US Department of Defense inform that Phoenix International Holdings Inc., Largo, Maryland, is being awarded a $75,000,000 indefinite-delivery/indefinite-quantity,

 
 
Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1965 sec (5 req/sec)