Port of Houston Deepening Project Hits Legal Snag

Wednesday, February 20, 2002
The Port of Houston Authority Commissioners voted recently to appeal the U.S. District Court's January 25 ruling that the Port should pay for the removal and relocation of pipelines to accommodate the widening and deepening of the Houston Ship Channel. "We believe Congress clearly specified in 1996 that pipeline owners, not the taxpayers of Harris County, should pay for the removal and relocation of pipelines needed to widen and deepen the Ship Channel," said Port Chairman James T. Edmonds. "The companies operating terminals along the Ship Channel are the primary beneficiaries of these Ship Channel improvements, and we believe -- with Congress and the U.S. Army Corps of Engineers -- that these companies, and not the public, should pay for the pipelines removal." The Port of Houston Authority owns and operates the public facilities along the Port of Houston, a 25-mile-long complex of diversified public and private facilities that handle more than 175 million short tons of freight worth more than $60 billion annually. The Port Authority plays a vital role in ensuring navigation safety along the Houston Ship Channel, a key economic catalyst for the city since the Port of Houston first opened to deep-water vessels in 1914. The Port is the source of more than 200,000 direct and related jobs and generates about $525 million annually in state and local taxes. The Port of Houston ranks first in the U.S. in foreign waterborne commerce and second in total tonnage. Each year, more than 7,000 vessels from around the world call at the Port.

The Houston Ship Channel is being deepened to 45 feet from its current depth of 40 feet, and widened to 530 feet from 400 feet, in order to safely move and efficiently handle large international cargo ships. In 1989, the voters authorized the Port's participation in the widening and deepening project. To make way for the deepening and widening, 87 pipelines that carry a variety of materials including chemicals and crude oil must be removed. The pipeline owners have indicated that in many cases, they want to relocate the pipelines under the Ship Channel. The United States Army Corps of Engineers, which is implementing the project, estimated that the cost to remove and relocate the pipelines will exceed $100 million.

History of the Dispute

In 1996, the U.S. Congress authorized the deepening and widening project in accordance with a feasibility study the Corps prepared. That study required the owners to pay for the cost of removing and relocating the pipelines. In 1998, pursuant to powers granted it by Congress, the Corps told the pipeline owners to move the pipelines. In November 1998, the pipeline owners, rather than bear the costs of moving and relocating the pipelines themselves, sued the United States Army Corps of Engineers and the Port of Houston Authority asking the Court to require the Port and the taxpayers to pay for the pipeline removal and relocation.

On January 25, 2002, a U.S. District Judge ruled for the pipeline owners and against the Corps and the Port. The Judge ordered that the letters the Corps sent the pipeline owners requiring them to pay for the pipeline removal be amended to require the Port to pay for the removal and relocation.

Maritime Reporter October 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


SAAM SMIT Towage Orders Damen ASD Tug

SAAM SMIT Towage, a joint venture between SAAM S.A. of Chile and Dutch company Royal Boskalis Westminster N.V., has signed a contract for the purchase of a Damen Tug 2913 for delivery in early 2016,

Sanmar to Build 6 Terminal Tugs for Svitzer

Svitzer has signed a contract with Turkish shipbuilder Sanmar Shipyard for the construction of six newbuild terminal tug vessels, the first of which is scheduled for delivery in Q4 2016.

Noreco CEO Quits

Norwegian Energy Company ASA (Noreco) announces that Tommy Sundt is stepping down as CEO of Noreco ASA. Since joining Noreco in September 2014, Tommy Sundt


New Boat Delivered to Tampa Bay Pilots

The Tampa Bay pilot association has taken delivery of its second Chesapeake Class launch and the first in a new generation of Gladding-Hearn Shipbuilding’s mid-size pilot boats,

Yemeni Port Says First Ship in Weeks Arrives

Press release - Officials at Yemen's Red Sea port of Hodeidah said the first ship to dock there in three weeks arrived on Tuesday, carrying desperately needed fuel,

Panama Canal Reports Record Tonnage

The Panama Canal Authority (ACP) announced a new tonnage record, welcoming 340.8 million Panama Canal tons (PC/UMS) through the canal for the 2015 fiscal year – a 4.

Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Pod Propulsion Port Authority Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1276 sec (8 req/sec)