Newport News Shipbuilding Awarded Contract

Thursday, December 12, 2002
Newport News Shipbuilding and Drydock Co., Newport News, Va., is being awarded a $143,103,367 cost-plus-fixed-fee modification for FY03 advanced planning and material procurement for the refueling and complex overhaul (RCOH) of the USS Carl Vinson. Work will be performed at Newport News (97 percent) and Puget Sound, Wash. (3 percent), and is to be completed by November 2003. Contract funds will not expire at the end of the current fiscal year. This contract was not competitively procured. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

VT Halter Begins Building LNG-powered ConRo Ships for Crowley

VT Halter Marine, Inc., a subsidiary of Vision Technologies Systems, Inc. (VT Systems), has commenced construction on the first of two liquefied natural gas (LNG)-powered,

US Navy Orders Demonstration Craft from Willard Marine

Willard Marine, Inc. (WMI) announced it has been selected through a solicitation process to supply a demonstration model of a new, advanced combatant craft for the U.

Alu Design to Create Next Generation of Marine Chairs

There’s a new designer in the driving seat at Alu Design. Per Ivar Selvaag, the former Lead Designer at BMW Group and Chief Designer of Peugeot’s concept car division,

 
 
Maritime Standards Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1768 sec (6 req/sec)