Labor Disputes Paralyze West Coast Ports

Tuesday, October 01, 2002
A contract dispute between the International Longshore and Warehouse Union (ILWU) and the Pacific Maritime Association has crippled West Coast Ports from Seattle to San Diego. According to reports, the shutdown forced some 11,000 unionized workers off their jobs while millions of dollars worth of cargo remained idle. The labor dispute between longshoremen and shipping lines could cost the nation $1 billion a day by halting scores of cargo deliveries. The Pacific Maritime Association, which represents shipping lines and port operators, has vowed to keep the 29 ports closed until the ILWU either agrees to extend its old labor contract or sign a new one. The ILWU said yesterday, that it will not be bullied into signing a contract extension. The ILWU refused to sign contract extensions beginning on September 2 despite appeals by PMA to keep peace on the docks by doing so.
Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Vigor’s Tacoma Yard Delivers Breasting Barges to Foss

Vigor Industrial expands its newbuild capacity in Washington; Tacoma yard delivers three breasting barges   Fabrication teams at Vigor Industrial’s Tacoma, Wash.

Hands Across the Water

U.S. firms leverage Netherlands-based Damen Shipyard’s vessel designs and technical support. For nearly 40 years, Damen Shipyards Group in the Netherlands has

Icebreakers Ordered for Neft’s Novy Port Project

Aker Arctic’s icebreaker design selected for Gazprom Neft’s Novy Port project   Aker Arctic and Vyborg Shipyard have confirmed a contract for the design of two

Ports

Arctic Offshore Rig Gets USCG Escort

U.S. Coast Guard (USCG) crews escorted heavy lift ship Blue Marlin as it toted a controversial 38,000-metric-ton drilling rig into Port Angeles, Wash., Friday. Blue Marlin,

Icebreakers Ordered for Neft’s Novy Port Project

Aker Arctic’s icebreaker design selected for Gazprom Neft’s Novy Port project   Aker Arctic and Vyborg Shipyard have confirmed a contract for the design of two

MacGregor's Pusnes bow loading systems for Suezmax Tankers

MacGregor, part of Cargotec, has secured contracts to supply Pusnes bow loading systems for three newbuild shuttle tankers intended for operations in Brazilian waters.

 
 
Maritime Security Navigation Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 1.2710 sec (1 req/sec)