Possible Delay in Chevron’s Delta LNG Production

Wednesday, November 09, 2005
According to a report in the Caracas Daily Journal, Chevron has found enough natural gas in Venezuela’s Orinoco Delta platform to warrant the country’s first LNG train. But Venezuela’s lacking gas infrastructure and indecisive construction plans have led some in the industry to wonder if Chevron will be forced to delay production. The Delta platform license issued by the energy ministry to Chevron last year stated that the company could submit a proposal to build pipe-lines from its fields to the planned CIGMA liquefied gas plant in the Paria Peninsula. But the government appeared to change its mind when state-run Petroleos de Venezuela (PDVSA) announced in August that it intended to build the pipelines by itself. The decision could delay production schedules for Chevron -- which has licenses for blocks 2 and 3 -- and for Norway’s Statoil -- which has a license for block 4. It could also postpone PDVSA’s goal to begin LNG exports by 2010. Source: Caracas Daily Journal
Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

Solving the LNG Propulsion Puzzle

The last piece of the LNG infrastructure puzzle, in the form of North America’s first LNG bunker barge, falls into place at Conrad’s Orange, Texas Shipyard. With

Caterpillar Acquires ESRG Technologies

Caterpillar Marine has completed the acquisition of ESRG Technologies Group, LLC, a vessel monitoring and data analytics company in the marine industry.   The

Naval Authorities Rely on OSE Separators from GEA

The trend of modernizing ships and fitting them with more efficient separator systems, which has been noticeable since 2014 particularly in Europe and North America,

LNG

Solving the LNG Propulsion Puzzle

The last piece of the LNG infrastructure puzzle, in the form of North America’s first LNG bunker barge, falls into place at Conrad’s Orange, Texas Shipyard. With

LNG Emergency, Incident Response Study

Safety around Liquefied Natural Gas (LNG) is a hot topic, now that LNG is more and more becoming the fuel of the future. The results of a recent LNG emergency

Sea Star Line, ACT Sign LNG Bunkering System Agreement

System will be the first of its kind in the US for maritime industry   Sea Star Line, LLC and Applied Cryo Technologies (ACT), in cooperation with Dragon Products,

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1298 sec (8 req/sec)