CB&I Wins Contract for China LNG Terminal

Thursday, December 15, 2005
CB&I won a turnkey contract valued at approximately $140 million for the design and construction of the terminal system works at a new liquefied natural gas (LNG) import terminal in Fujian Province, Peoples Republic of China. CB&I's work scope for the contract includes the turnkey engineering, procurement, construction and commissioning of the terminal system works, which encompasses civil, mechanical, piping, structural, buildings, and electrical and instrumentation work, and includes the marine loading arms and regasification system. The terminal is scheduled for commercial operation in early 2008.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Demand, Bunker Pricing Spurs Asia Dry Bulk-Capesize Rates

Owners asking $1 per tonne more on Australia-China rates; Panamax rates climb to two-month high, but remain under pressure. Freight rates for large capesize

AWO Authorizes ClassNK to Perform RCP Audits

The American Waterways Operators (AWO) and ClassNK have signed an agreement under which ClassNK will be authorized to conduct audits of AWO's Responsible Carrier Program,

Radio Holland Wins Contracts for Canadian Coast Guard Vessels

Radio Holland Canada has won two major contracts to support the Canadian Coast Guard. Public Works and Government Services Canada, which is responsible for government procurement,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0631 sec (16 req/sec)