PGS to Build New Supply Vessel at Aker Yards

Wednesday, March 22, 2006
Petroleum Geo-Services ASA (PGS) has announced that it has signed an agreement of main commercial terms to build a new third generation Ramform vessel at Aker Yards, Langsten, to be delivered in 2008. The agreement is subject to satisfactory completion of a final contract and board approval in Aker Yards. The new Ramform is scheduled for delivery in the first quarter 2008, in time for the North Sea season. PGS will also have an option of building a sister vessel at the same yard. Aker Yards has previously constructed all of the PGS' six current Ramform vessels, demonstrating a strong track record for timely and cost effective construction of this advanced design, according to the company. This is the first PGS new build since the delivery of Ramform Vanguard in 1999. The third generation Ramform is designed with a clear objective to further extend the PGS lead in 3D seismic acquisition productivity and efficiency. The design builds on the proven industry leading capabilities of the current Ramform fleet, while introducing several improvements. The vessel will be lengthened by approximately 16 meters, giving higher fuel capacity and transit speed. A substantial power upgrade will significantly increase speed while surveying. The vessel will be capable of towing up to 22 streamers. A range of technology improvements will be implemented to maintain or improve efficiency of handling, deployment, retrieval and maintenance of the in sea equipment.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

FIO’s New Research Vessel Enters Build Phase

The 78’ research vessel designed and engineered by Boksa Marine Design (BMD) in 2015 is headed to the building phase beginning in June.   BMD contracted with

HII Secures Aircraft Carrier Planning Contract

Huntington Ingalls Industries (HII) was awarded a $152 million contract for advance planning for the construction of the third aircraft carrier in the Gerald R.

Maritime Future Summit: Digital Shipping

Autonomous ships, smart on-board systems: At the Maritime Future Summit on September 5, industry leaders will discuss the future of shipping. For the first time

 
 
Maritime Careers / Shipboard Positions Maritime Security Offshore Oil Pod Propulsion Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0545 sec (18 req/sec)