Submarine Comes Together at Northrop Grumman

Thursday, September 14, 2006
Northrop Grumman reached a construction milestone on August 31 when it completed the final hull welds of the Virginia-class submarine North Carolina (SSN 777). This accomplishment, known as “pressure hull complete,” signifies the hull sections being joined to form a single unit. It is the last major milestone before the ship’s christening next spring.

“This is a giant step on the path to deliver North Carolina,” said Becky Stewart, vice president of the submarine program for Northrop Grumman’s Newport News sector. “She’s starting to come together and look like a submarine now, which is a testament to our shipbuilders and their commitment to not only producing a high-quality product, but to their tireless efforts to improve processes and results along the way.” Northrop Grumman is building North Carolina, the fourth ship of the Virginia-class, using lessons learned from the previous three ships of the class. It is currently 76 percent complete and is on track to deliver in February 2008.

Many of the 1,000 Newport News employees building the Virginia-class submarines signed a special banner to mark the occasion. Northrop Grumman is teamed with General Dynamics Electric Boat to build the first 10 ships of the Virginia class. Current plans call for 30 Virginia-class submarines in the fleet. Designed to meet the Navy’s requirements in a post-Cold War security environment, the submarines use advanced technologies to increase firepower, maneuverability and stealth. The 377-ft. long submarines are capable of submerged speeds of more than 25 knots and can stay submerged for months at a time. The keel for North Carolina was laid on May 22, 2004. Upon delivery to the Navy in early 2008, it will be the most modern and sophisticated attack submarine in the world, providing undersea supremacy well into the 21st century.

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

DNV GL’s Synergi to Manage Siem Offshore Newbuilding Projects

Siem Offshore has chosen DNV GL’s Synergi Project to manage nine newbuilding projects. Synergi Project software The software is used to optimize the collaboration

Bahri Inks Contracts with Hyundai to Build 5 VLCCs

The National Shipping Co. of Saudi Arabia (Bahri) signed contracts on Thursday with Hyundai Samho Heavy Industries (HSHI) to build five very large crude carriers (VLCCs),

USS George Washington Completes Carrier Qualifications

Carrier Air Wing (CVW) 5 and the Nimitz-class aircraft carrier USS George Washington (CVN 73) completed its carrier qualifications (CQ), May 23. CQ allows

Container Ships

Dortmund Port's Throughput Up

In 2014, Dortmund’s combined goods throughput on ships and trains amounted to 5.7 million tonnes, compared to 5.3 in the previous year. 2.9 million tonnes (+600,000) of this was ship related.

KPCT Launches New Gulf Service

Containerized volumes are steadily increasing on the East Coast of India. Keeping pace with the growth, Krishnapatnam Port Co. Ltd. (KPCT) now offers a new service to the Gulf sector.

Shipping Freight Rates Drop Amidst Overcapacity

Shipping freight rates on the world's busiest route, from Asia to Northern Europe, fell by the largest percentage amount since 2008, reflecting wild volatility

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1173 sec (9 req/sec)