Submarine Comes Together at Northrop Grumman

Thursday, September 14, 2006
Northrop Grumman reached a construction milestone on August 31 when it completed the final hull welds of the Virginia-class submarine North Carolina (SSN 777). This accomplishment, known as “pressure hull complete,” signifies the hull sections being joined to form a single unit. It is the last major milestone before the ship’s christening next spring.

“This is a giant step on the path to deliver North Carolina,” said Becky Stewart, vice president of the submarine program for Northrop Grumman’s Newport News sector. “She’s starting to come together and look like a submarine now, which is a testament to our shipbuilders and their commitment to not only producing a high-quality product, but to their tireless efforts to improve processes and results along the way.” Northrop Grumman is building North Carolina, the fourth ship of the Virginia-class, using lessons learned from the previous three ships of the class. It is currently 76 percent complete and is on track to deliver in February 2008.

Many of the 1,000 Newport News employees building the Virginia-class submarines signed a special banner to mark the occasion. Northrop Grumman is teamed with General Dynamics Electric Boat to build the first 10 ships of the Virginia class. Current plans call for 30 Virginia-class submarines in the fleet. Designed to meet the Navy’s requirements in a post-Cold War security environment, the submarines use advanced technologies to increase firepower, maneuverability and stealth. The 377-ft. long submarines are capable of submerged speeds of more than 25 knots and can stay submerged for months at a time. The keel for North Carolina was laid on May 22, 2004. Upon delivery to the Navy in early 2008, it will be the most modern and sophisticated attack submarine in the world, providing undersea supremacy well into the 21st century.

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

ClassNK's Noboru Ueda Attends KOTC Delivery Ceremony

Mr. Noboru Ueda, Chairman and President of ClassNK attended the delivery ceremony for the M/T Al Yarmouk, constructed at Daewoo Shipbuilding & Marine Engineering Co.

RIMPAC Exercise Puts LCS Through Paces

It was the middle of May, and the littoral combat ship Independence was operating out of San Diego, testing components of the mine warfare mission package. The mission is one that,

New Superyacht ROCKIT.IT Launched by Feadship

Feadship says it has launched the outstanding 60.35-metre motoryacht ROCK.IT. Created for an experienced owner who has chartered Feadships and appreciated the essence of the brand,

Container Ships

NYK Opens New Planning Center in Kumamoto

On September 1, 2014, NYK and Kozo Keikaku Engineering Inc. established a stowage planning center for container shipping at the Kumamoto office of Kozo Keikaku Engineering Inc.

More German Shipowners Look to Gibdock for Repairs

Gibdock remarks it has continued to see its stock rise amongst the German shipowner community over the past year. Indeed the Gibraltar ship repair yard’s recent

No Sign of Ultra-Large Containership Mega Hubs: Analysis

Contrary to the views of some in the industry, Ultra Large Container Vessels are continuing to call at multiple North European ports per loop and are not concentrating on a mega-hub,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2146 sec (5 req/sec)