MarAd -LNG DWP license application

Tuesday, November 21, 2006
The Coast Guard and the Maritime Administration (MarAd) issued a notice stating that an environmental impact statement will be prepared as part of the environmental review of the Calypso LNG DWP license application. The application is for construction and operation of a liquefied natural gas (LNG) deepwater port (DWP) in the Atlantic Ocean approximately nine miles northeast of Port Everglades. A public meeting to receive comments on the project will be held in Fort Lauderdale on December 6. Written comments should be submitted by December 21. source: HK Law
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Education/Training

MARAD Tests Alternative Power for Ships

The Maritime Administration (MARAD) is testing state-of-the-art, environmentally efficient technology onboard the Training Ship (TS) Kennedy.   The National Defense

Schottel Optimizes Training With Simulator

Since autumn 2014 customers can exercise their handling and knowledge of SCHOTTEL propulsion systems in the SCHOTTEL Academy by using a training simulator.   Academy

Class NK Eyes Singapore Renewable Energy Facility

ClassNK has launched a feasibility study for a new marine renewable energy testing facility to be built in Singapore.   The announcement was made at the 2014

 
 
Maritime Standards Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1840 sec (5 req/sec)