Raytheon Completes DDG 1000 Deckhouse Integration Design

Thursday, December 14, 2006
Raytheon Company, which has operations in Marlboro, has completed the Delta Interim Detailed Design Review for the DDG 1000 Integrated Deckhouse and Apertures (IDHA) element, set to be installed on the Navy's next generation multi-mission destroyer. The review took place at Raytheon's Sudbury-based Integrated Defense Systems (IDS) Sensors and Surveillance Center. The IDHA element is responsible for the integration design of apertures antenna arrays for functions such as radars and communications. This requires flush mounting of the arrays on the deckhouse to ensure that the destroyer meets stealth requirements per its duties as a multi-mission vessel. In the review, the IDHA element received confirmation that all design and performance requirements were defined and that the design will meet those requirements. With this latest round of approval, Raytheon moves closer to production of the IDHA element. Fabrication and installation of the apertures is anticipated to start in mid-2008, after a production readiness review is completed next year. source: Worcester Business Journal

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

USCG Foundation Run to Remember Events Announced

The Coast Guard Foundation, a non-profit organization committed to the education and welfare of Coast Guard members and their families, announced this year’s Run

Port of Vancouver CEO Coleman to Step Down

Todd Coleman, CEO of Port of Vancouver USA, step down from his position May 19, after 15 years with the port.   Coleman, a Professional Engineer, began his career with the port in 2001,

Jensen Debuts New Tractor Tug Design

Crowley Maritime Corp.’s Seattle-based naval architecture and engineering firm, Jensen Maritime, reports it has designed a new tractor tug for Vessel Chartering

LNG

NASSCO Delivers First ECO Class Tanker for SEA-Vista

On Thursday, April 28, 2016, General Dynamics NASSCO delivered the first ship in a series of three ECO Class tankers currently under construction for SEA-Vista LLC.

Crowley to Christen 3rd LNG-ready Product Tanker

Crowley Maritime Corp. announced it will hold a christening ceremony Thursday, May 5 in New Orleans for the newly built Louisiana, the company’s third of four new Jones Act product tankers.

India Seeks Stake in Iran LNG Terminal

Indian Petroleum Minister Minister Dharmendra Pradhan says India has expressed interest in setting up an LNG terminal at Chahabar port in Iran to ship back home natural gas from Persian Gulf nation,

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0861 sec (12 req/sec)