Bulyard Shipbuilding to Contruct New Vessels

Thursday, August 16, 2007
Navigation Maritime Bulgare (Navibulgar) will receive three new ships after a contract for the construction of the ships was signed, Focus news agency reported. Bulyard-Shipbuilding Industry AD will construct the vessels. Prime Minister Sergei Stanishev was also present at the contract signing ceremony. The ships to be constructed will be cargo ships. They will be constructed respectively by December 2009, September 2011 and January 2012.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

LNG: Did the Greeks Get it Wrong?

In December 2013, Alibra’s market report front page read: “When in shipping, do as the Greeks do.” At that time, Alibra was referring to the fact that 31% of the

Ithaca’s FPF-1 platform to be moved to Stella field

Ithaca Energy Inc. reports that the "FPF-1" floating production facility has completed the required inclination test as planned and departed the Remontowa shipyard in Gdansk, Poland.

Live Fish Carrier Launched at Gondan

At high tide, the vessel “MARTIN SÆLE”, the first Live Fish Carrier built by Gondan Shipyard in Figueras, was successfully launched today. Representatives of the owner of the vessel,

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Pod Propulsion Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0548 sec (18 req/sec)