Bulk Carrier Grounds Off Hawaii

Friday, February 04, 2005
HONOLULU - The Coast Guard continues to monitor a grounded ship at the entrance to Barbers Point Harbor. The Cape Flattery and crew were inbound to Barbers Point Harbor at about 7 a.m. to offload cement when it ran aground about 400 yards from the entrance.

The current plan is for the ship's owner to complete a salvage plan and have all necessary tugs in place before a high tide at about 8 p.m. The four tugs are on scene to assist in refloating the Cape Flattery.

At this point there is no apparent pollution or hull damage. Coast Guard inspectors are currently interviewing the captain and crew and investigating the cause of the accident.

The Coast Guard Cutter Washington remains on scene with the Cape Flattery as a communications platform and to monitor any developments.

The Cape Flattery is a 555-foot bulk carrier, registered in Hong Kong, is managed by Pacific Basin Shipping HK Ltd. The ship is carrying cement and about 117,000 gallons of fuel oil and lubricants.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

KVH Outlines Ship-to-Shore Connectivity

The next generation of connectivity between ship and shore will be dominated by the development of applications to help ship owners and managers reduce costs by enhancing operational efficiency,

Baltic Sea Freight Index Edges Higher

The Baltic Exchange's main sea freight index, which tracks rates for ships carrying dry bulk commodities, edged higher on Monday as rates rose for vessels across all segments.

Rotterdam Gate LNG Terminal Expansion Started

Dutch gas network operator Gasunie and tank storage service provider Vopak said on Monday that the expansion of their Gate liquefied natural gas (LNG) terminal in Rotterdam has begun.

Casualties

Amid Yemen Chaos, China Lifts More Oil

China has managed to export a large shipment of crude oil from Yemen over the weekend, ship-tracking data showed on Monday, despite mounting chaos in the country

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

USCG Flush Ice down River Systems to Facilitate Shipping

The Coast Guard cutter fleet is flushing ice through the Great Lakes river systems to prevent ice jams and facilitate commercial shipping as the shipping season

 
 
Maritime Contracts Maritime Security Naval Architecture Offshore Oil Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1310 sec (8 req/sec)