RFA Brambleleaf Completes Refit

Friday, June 28, 2002
A&P Falmouth has confirmed that the RFA Brambleleaf has successfully completed its latest refit at their facility. The vessel dry docked in Falmouth on May 1 for a refit and repair program which included full hull coating preparation and painting, rudder repairs, propeller blade replacement, remedial work on the anchors and cables, a full overhaul of the ships salt water system and also a major repair/remedial work program carried out on the ships cargo and ballast systems. All within tight parameters of both time and quality control. Further work was carried out after the vessel undocked. This involved the refurbishment of the crews living quarters, freshwater system, galley and food storage areas and the installation of a new sewage treatment plant. On June 14 the vessel was due out for sea trials. For these trials, the yard carried out survey work on the starboard main engine and the starboard diesel alternator, strip down and rebuild of gearbox couplings and clutches, overhaul of numerous pumps, the vessels navigation system and the classification surveyors loadline requirements. The sea trial was carried out on time and to great success. Overall, the contract was completed within strict time constraints and A&P Falmouth are delighted to have been given the opportunity once again by the Ministry of Defence to prove their ship repairing ability and expertise with the RFA Brambleleaf.
Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Added Value Innovation Drives Control of BWTS

Specifying for ballast water treatment systems can be a difficult process. Ian Hamilton, sales manager for marine electrical wiring control and instrumentation specialists CMR Group, offers guidance.

Hospital Ship Brought up to Speed with AMOS

SpecTec will work with long term partner Mercy Ships to migrate its current system Business Suite to AMOS Enterprise Management Suite (EMS).   Mercy Ships’ Africa Mercy,

Repair Yard Chosen for Lysblink Seaways

Cargo ship Lysblink Seaways will be towed to Inchgreen, Greenock for repair work after grounding last month on Scotland’s west coast.   The vessel, which ran aground February 18,

Coatings & Corrosion

Editorial: Gettin’ Crabby with Deadliest Catch

As February is our traditional cruise shipping edition, naturally we’ve selected a fishing boat and two crabs for the cover. But as many of you may already know,

Tall Ship Docked for Repairs

The largest brig to be built in the U.K. in a century sailed into in a Greenock dry dock yesterday for general maintenance and essential winter repairs.   The

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1968 sec (5 req/sec)