Building Completed at Bradford’s Grand Bahamas Facility

Thursday, June 06, 2002
Officials at Bradford Grand Bahamas repair and refit shipyard are pleased to announce that a new metal fabrication building was recently completed and is now serving customers at it¹s Freeport location. The 175 ft. by 40 ft. fully covered maintenance facility is one of several expansion projects underway at Bradford's 12-acre shipyard. The new fabrication building is located directly alongside an expansive dry dock slip. With capabilities for all types of repair and refit work – including painting, welding, machine shop, hydraulics, carpentry and fiberglass - Bradford Grand Bahamas site includes the new fabrication building and a 2000-square foot propeller shop. Other features include a 1,200-ton floating dry dock (to haul vessels up to 230 feet), and a 150-ton TraveLift. With capabilities to expand to one mile of waterfront Bradford's Grand Bahamas shipyard is located along a canal avenue with a depth of 30 ft. and no overhead restrictions.

Conceived in 1997 when more than 50 acres were acquired, the opening of the Bradford site might be considered as Phase I of a much broader Bahamas Long-term plans include the development of 20 acres of land to build individual megayacht shelters to accommodate yachts up to 420 feet with working and storage space as well as overnight crew accommodations. "There is currently no other shipyard in the proximity of the Bahamas with the technical capabilities and high engineering standards of Bradford Grand Bahamas said Tom Krigger, assistant superintendent, Bradford Marine, Inc. "We are pleased to offer our services for the megayacht customer sailing the Bahamas."

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

World’s First LNG-Ready Ultra Large Container Ship Named

The race is on in global maritime circles to be the “world’s first” in every aspect of environmental friendliness, particularly in regards to the incorporation of LNG as fuel onboard commercial ships.

Wärtsilä Integrated Solutions for Maersk's AHTS Vessels

A new series of six Anchor Handling Tug Supply vessels to be built at the Kleven Verft AS in Norway for the Danish based Maersk Supply Service A/S - part of the A.

ClassNK Approves Niigata Dual-fuel Engine Design

Classification society ClassNK has granted approval to the design of the new 28AHX-DF dual-fuel engine developed by Niigata Power Systems Co., Ltd. The new engine

Shipbuilding

World’s First LNG-Ready Ultra Large Container Ship Named

The race is on in global maritime circles to be the “world’s first” in every aspect of environmental friendliness, particularly in regards to the incorporation of LNG as fuel onboard commercial ships.

Wärtsilä Integrated Solutions for Maersk's AHTS Vessels

A new series of six Anchor Handling Tug Supply vessels to be built at the Kleven Verft AS in Norway for the Danish based Maersk Supply Service A/S - part of the A.

MacGregor Deck Equipment for Intership's Eco-bulkers

MacGregor, part of Cargotec, has secured a deck equipment contract from New Times Shipyard in China for Intership Navigation Co Ltd.'s three new 36,500 dwt laker-class bulk carriers.

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1990 sec (5 req/sec)