DoD Certifies LPD-17 Program

Friday, May 10, 2002
The LPD-17 Amphibious Transport Dock Ship program is one of six acquisition projects the Defense Department recently certified to Congress under the Nunn-McCurdy Law. The certification allows the programs to move forward, said Undersecretary of Defense for Acquisition, Technology and Logistics Pete Aldridge, during a press roundtable May 2. The LPD-17, a program of Naval Sea Systems Command's Program Executive Office for Expeditionary Warfare, is a new class of amphibious transport dock ship incorporating advanced performance and warfighting technologies that will enhance the amphibious fleet's operational flexibility.

There are four ships under contract leading to a 12-ship buy. "Ninety-five percent of the design has been completed," Aldridge said. "Most of the problems are behind us." The Nunn-McCurdy Law requires the Secretary of Defense to certify that programs with a 25 percent cost increase are necessary for national security. It also mandates the department put controls in place to get costs under control. Programs not certified are canceled. According to Aldridge, certification is based on whether the program is essential for national security, the availability of an equally capable, lower-cost alternative, cost control and if management is in place to keep spending under control. The other certified programs include the H-1 helicopter; the CH-47 Chinook helicopter, the chemical demilitarization program, the Multiple-Launch Rocket System upgrade program, and the Space-based Infrared System-High. Source: NAVSEA News Wire

Maritime Today

The Maritime Industry's original and most viewed E-News Service

Maritime Reporter November 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Maersk to Idle Vessel

The world's biggest container-ship operator Maersk Line  has confirmed market talk that it has temporarily idled one of its largest vessels - yet another sign that the industry is in dire straits,

Russian Navy Trying Hard for Facelift

Official announcements related to naval shipbuilding give the appearance of a Russian Navy that is undergoing a rapid revival. However, the reality is that many

USNS Maury Completes Acceptance Trials

USNS Maury (T-AGS 66) completed Acceptance Trials, November 6, following a week of extensive ship tests and underway events, included testing of major propulsion,

Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0768 sec (13 req/sec)