Seaway Falcon Performs Deepest Pipelay

Friday, April 05, 2002
Stolt Offshore in Houston has successfully completed a deepwater subsea to subsea installation, including one flowline and one umbilical, for Shell's single well Einset project in the Gulf of Mexico, reports Bjorn Koi, Stolt's project manager. "Subsea to subsea installations are 'rare' in the industry but may become more prevalent as we move into deeper waters. To date, most subsea tie-backs have been supported by host platforms in shallower water. "In the case of Einset, we tied back a new deepwater well to existing subsea infrastructure, also located in deepwater. This achievement demonstrates how the industry is applying proven technology while effectively utilizing deepwater construction vessels, such as Stolt's Seaway Falcon," said Koi. He added that the "Seaway Falcon" multipurpose vessel achieved its deepest pipelay to date, with the Shell Einset well located in 3,463 ft. of water on Viosca Knoll Block 872. The Stolt crew completed the umbilical and flowline installation project in a single mobilization, using a J-lay installation method. The project scope included the setting of two long base line (LBL) arrays-a collection of acoustic beacons or transponders-to ensure the accurate installation of two Shell-supplied pipeline end manifolds (PLEMs) at each end of the six-inch flowline; i.e., one at the Einset well and one at the SE Tahoe 1 well. The two pipeline jumpers, installed by others, connected the PLEMs to the wells. Stolt's "Seaway Rover" ROV (remotely operated vehicle) support and survey vessel completed the LBL arrays, installing six transponders at Einset and eight transponders at SE Tahoe 1 in advance of the flowline installation work. "The accuracy rate in using the LBL array is very high. We hit our target boxes for installing the PLEMs with excellent precision due to the good work of the 'Seaway Falcon,'" said Koi. The PLEMs themselves represented a challenge as well, says Koi, explaining that Stolt designed and fabricated a purpose-built PLEM handling frame to accommodate their size and facilitate installation. Each PLEM was approximately 25 feet tall, with the PLEM installed at Einset weighing 24 metric tons and the PLEM at for the SE Tahoe location weighing 18 metric tons.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

Kalmar to Debut its latest at TOC Europe Exhibition

Kalmar, part of Cargotec, will introduce yet another port industry first during the upcoming TOC Europe exhibition in Rotterdam, the Netherlands. On 9 June, ONE is coming.

L.A., Long Beach Create Supply Chain Working Groups

Seeking new supply chain efficiencies, the ports of Los Angeles and Long Beach have announced the creation of working groups focusing on peak operations and

V.Group Opens New Centre in Manila

V.Group the world’s leading provider of maritime services, together with its market leading third party ship management arm, V.Ships, are celebrating the inauguration

Offshore

Lerwick Port Promoting Shetland Fishing Industry

The importance of investment in the Shetland fishing industry has been highlighted today by Lerwick Port Authority Chief Executive, Sandra Laurenson. The industry – white fish,

Five Years on from Macondo

An interview with NOIA’s Randall Luthi provides unique perspective on where the offshore energy business has been, where it is now, and where it could be headed next.

Offshore O&G: Weathering the Storm

Vessels are stacked as Gulf oil operators retrench and day rates fall. In the Gulf of Mexico, vessels serving offshore oil-and-gas exploration and production are

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1399 sec (7 req/sec)