USS Greeneville Undocks

Tuesday, November 25, 2008

Portsmouth Naval Shipyard, Kittery, Maine, successfully undocked USS Greeneville (SSN 772) one week early on Nov. 14 by returning to "back-to-basics" work practices.

"Back to basics", one of the key focus areas of Naval Sea Systems Commander, Vice Adm. Kevin McCoy, is about eliminating bottlenecks and optimizing the workday to improve shipyard processes with the goal of completing quality availabilities on time and on cost.

During his facility visit in October, McCoy left no doubt in the minds of the shipyard workforce about his passion to "sustain today's fleet efficiently and effectively."

"It is absolutely critical that we meet this commitment," McCoy stated. "Our Navy and our nation need these submarines back at sea, and I'm convinced that the men and women of Portsmouth Naval Shipyard are up to accomplishing the task."

Greeneville is presently undergoing a scheduled 15-month depot modernization period at the shipyard.

Rallying around Greeneville's project team and the ship's crew, the entire workforce took the challenge and got "back to basics."

"It was a great effort by the whole shipyard team," said Capt. Robert Mazzone, shipyard commander. "I am extremely proud and humbled to be working with such a professional group of men and women."

"The project team charged forward, closing out all external tanks and persevered through some challenging obstacles to take this ship one step closer to returning to the front line," remarked Capt. Kurt Crake, operations officer.

"Sustaining today's fleet is essential in achieving a 313-ship Navy. Portsmouth Naval Shipyard is a critical component in that effort, and undocking Greeneville a week early significantly contributes to the shipyard's target to return the ship to the fleet on schedule in May 2009," said McCoy.

Portsmouth Naval Shipyard is one of NAVSEA's four public shipyards which play a major role in maintaining America's fleet and provide wartime surge capability to keep the nation's ships ready for combat.

(Source: Navy News Service)

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

NRL Researchers Demo Ship-to-Shore Data Link

Scientists at the U.S. Naval Research Laboratory (NRL) along with Mercury Continuity (MC) have demonstrated the Tactical Reachback Extended Communications (TREC) system in the port of Miami.

NASSCO Opens Bremerton Repair Facility

General Dynamics NASSCO celebrated the grand opening of its new location in Bremerton, Wash., yesterday. The facility will support the company’s recently-awarded contract to repair and maintain U.

NASSCO Opens New Facility for Naval Repair

General Dynamics NASSCO opened a new location yesterday in Bremerton, Wash. to support the company’s recently-awarded contract to repair and maintain U.S. Navy

News

WSC CEO Koch to Retire in 2015

Chris Koch, current president and CEO of the World Shipping Council (WSC), will retire from his position on July 31, 2015, and WSC Senior Vice-President and General Counsel,

NMEA Updates Installation Standards

2014 edition of NMEA 0400, Version 4.00 features extensive updates and new information   The National Marine Electronics Association (NMEA) has published Edition 2014, Version 4.

Port of Galveston to Repair Public Pier

Galveston Wharves’ board of trustees today unanimously approved a project to repair pilings and pier deck in the Pier 19 area of the port. The board awarded the contract,

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Offshore Oil Pipelines Port Authority Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1595 sec (6 req/sec)