Niagara/Welland-Notice to GL Shipping

Thursday, December 04, 2008

The St. Lawrence Seaway Management Corporation announced two-Person lockage procedures at Lock 8. Mariners are advised that as of December 2, 2008, the St. Lawrence Seaway Management Corporation will be conducting tests using revised two-person lockage procedures at Lock 8.

Vessels will be invited to participate in these trials. Mooring wires will be secured in the same order as outlined in the current procedures. Pilots / Masters are asked to convey any comments they have to the lock crew who will record them.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navigation

Crippled Pine Galaxy Arrives in San Francisco

The disabled mixed-products tanker Pine Galaxy arrived in San Francisco for repairs Wednesday. Commercial tugs towed the ship safety into the Port of San Francisco

Governors Write Obama for Mississippi River Funding

Governors seek President Obama’s support for upper Mississippi River commercial navigation locks and ecosystem The Governors of the five Upper Mississippi River States of Illinois,

Panama Canal: The Billion Dollar Challenge

Panama Canal expansion will cost operators, insurers As the Panama Canal prepares to celebrate its 100th anniversary, insurers are warning of the increased risks

 
 
Maritime Standards Naval Architecture Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0969 sec (10 req/sec)