Wärtsilä Receives Order for FSV Design

Tuesday, March 10, 2009

Wärtsilä, ship power system integrator for the marine industry, has received a ship design order from the Norwegian shipping company Sartor Shipping AS. The order is for two Vik-Sandvik 465 FSV design vessels that will be built at the Wison Heavy Industry shipyard in China. Wärtsilä scope of supply also includes two main engines, gear boxes and propellers. Sartor Shipping has options for further newbuildings at the yard. The vessels are due for delivery in 2010 and 2011.

The design incorporates a hybrid system that offers considerable fuel savings compared to a purely diesel mechanical solution. This is because the available power can be adjusted to meet the various demands of the different operations that this type of vessel will be used for. The savings will be particularly notable when operating at lower power loads.

Multi-functionality is an extremely important feature of this design as the vessels are intended for use in a multitude of different tasks. These are likely to include offshore standby service, emergency towing, oil spill recovery, ROV (Remotely Operated Vehicle) operations, fire fighting, tanker assistance and surface surveillance.

The vessels will have redundant Dynamical Position system, DP II. The speed of the vessels will be approximately 51 ft. The vessels' length is 216 ft and the beam 59 ft. They will comply with the Bureau Veritas (BV) 'Clean Ship' notation for pollution prevention.

Wärtsilä acquired the global ship design group Vik-Sandvik in July 2008.

(www.wartsila.com)

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Workboats

Design & Operation: Wind Farm Support Vessels

Offshore wind farm development has been led globally by the UK, followed by Germany. Both countries have governments with long term commitments to renewable energy.

Bids Placed for Novy Port Icebreaker Contract

Seven companies submit bids for contract for Yamal Novy Port terminal icebreaker   The tendering process for the Yamal Novy Port terminal icebreaker design and build contract has kicked off,

Dredge Yard, Neptune Shipyards Introduce New Dredger

Dredge Yard announced it has partnered with Netherlands-based Neptune Shipyards to develop the new cutter suction dredger, EURO DREDGER 450. Iulia Berchiu, Dredge Yard’s Marketing Manager,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Pipelines Port Authority Ship Electronics Ship Repair Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1220 sec (8 req/sec)