Wärtsilä Receives Order for FSV Design

Tuesday, March 10, 2009

Wärtsilä, ship power system integrator for the marine industry, has received a ship design order from the Norwegian shipping company Sartor Shipping AS. The order is for two Vik-Sandvik 465 FSV design vessels that will be built at the Wison Heavy Industry shipyard in China. Wärtsilä scope of supply also includes two main engines, gear boxes and propellers. Sartor Shipping has options for further newbuildings at the yard. The vessels are due for delivery in 2010 and 2011.

The design incorporates a hybrid system that offers considerable fuel savings compared to a purely diesel mechanical solution. This is because the available power can be adjusted to meet the various demands of the different operations that this type of vessel will be used for. The savings will be particularly notable when operating at lower power loads.

Multi-functionality is an extremely important feature of this design as the vessels are intended for use in a multitude of different tasks. These are likely to include offshore standby service, emergency towing, oil spill recovery, ROV (Remotely Operated Vehicle) operations, fire fighting, tanker assistance and surface surveillance.

The vessels will have redundant Dynamical Position system, DP II. The speed of the vessels will be approximately 51 ft. The vessels' length is 216 ft and the beam 59 ft. They will comply with the Bureau Veritas (BV) 'Clean Ship' notation for pollution prevention.

Wärtsilä acquired the global ship design group Vik-Sandvik in July 2008.

(www.wartsila.com)

Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Workboats

Fratelli Neri Orders Damen Tug

One of the largest Italian tug owners, Fratelli Neri S.p.A, ordered its first Damen tug, an ASD 3212, on 21 July 2015.   The vessel will be the first ASD tug

Shell Moves Ahead in Arctic with Exploratory Well

Shell Oil's icebreaker MSV Fennica weaved through nine remaining protesters hanging from the St. Johns Bridge and made its way toward the Pacific Ocean.   Authorities

Engine Refit for Mersey Pilot Boat

James Troop supplies two new Volvo Penta engines to upgrade Mersey pilot boat   Merseyside-based engine specialist James Troop & Co has secured a deal to supply

 
 
Maritime Standards Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1041 sec (10 req/sec)