Keppel Delivers Third Maersk DSS 21 Semisub

Friday, April 16, 2010
Photo courtesy Keppel FELS

Keppel FELS Ltd (Keppel FELS) delivered the third DSS 21 deepwater semisubmersible (semi) drilling rig to Maersk Drilling (Maersk) 43 days ahead of schedule and with a perfect safety record, garnering a bonus of $400,000.

Mr Claus V. Hemmingsen, CEO of Maersk Drilling said, “The Maersk-Keppel partnership, spanning a decade, has achieved considerable milestones together.

“Now, with the addition of Maersk Deepwater Semi III, our high-specification DSS 21 rig fleet which is in the league of some of the world’s most advanced deepwater rigs will help position Maersk Drilling as the leading offshore solutions provider in the industry.

“We are pleased with the consistently excellent performance Keppel FELS has demonstrated, to continuously improve construction of the series of rigs.”

Tong Chong Heong, CEO of Keppel O&M, said, “We are proud to be Maersk’s preferred partner for its fleet expansion plans. The safe and early completion of Maersk Deepwater Semi III attests to the astute choice made by Maersk to build the premium fleet with Keppel FELS, as well as the solidarity and calibre of our teams working hand in glove with one another.

“The success of this Series of semis is built upon our long term partnership with thought-leading operators such as Maersk, who have provided the necessary platforms for our technologies to gain market ascendance.

“At Keppel O&M, we are focused on providing quality solutions to meet the emerging challenges in deeper waters and harsher environments. We will continue to grow and leverage our technology capabilities to better serve our customers’ needs. We are confident that this high quality rig will deliver the highest performance as had its predecessors.”

"The demand for modern drillings rigs has increased over the past years concurrently with the growing technical challenges we are faced with in the drilling industry. The search for new finds is moving to deeper waters and areas with complex soil conditions and more advanced drilling rigs are needed to meet those challenges. Our ultra deepwater semisubmersibles are well equipped to meet this demand,” Mr Claus V. Hemmingsen, CEO of Maersk Drilling added.

DSS Series rigs are highly cost effective exploration units capable of drilling down 10,000 m (30,000 ft) wells and operating at a water depth of 3,000 m (10,000 ft). The Series also features a dynamic positioning system, with the ability to attach to a prelaid mooring system.

DSS Series rigs are particularly well suited to drill deep and complicated wells in areas such as offshore West Africa, Brazil, the Gulf of Mexico and Southeast Asia, and may be further customised to meet the unique challenges of each location.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

China Unveils Action Plan on Maritime Silk Road

China has unveiled the principles, framework, and cooperation priorities and mechanisms in its Maritime Silk Road initiative in a bid to enhance regional connectivity

JV Wins $2bln Freeport LNG Contract in US

A joint venture (JV) between CB&I, Chiyoda International and Zachry Industrial has won a contract worth over $2bn from FLNG Liquefaction 3 for a liquefied natural

Feds Delay LNG’s Port Ambrose Application

The US Coast Guard and the US Maritime Administration (MARAD) have temporarily suspended their review of the proposed Port Ambrose deep-water LNG import terminal.

Vessels

Gulf Bridge Express Service to End

The Gulf Bridge Express Service will shortly be terminated with the last roundtrip voyage being MV Saint Nikolaos voyage 00008S, ETA New Orleans on April 22, 2015.

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2672 sec (4 req/sec)