ACP Awards Contract for Construction of New Dredge

Wednesday, March 26, 2008

Moving forward with its equipment upgrades for the Expansion Program, the Panama Canal Authority (ACP) officially awarded the contract to design and build a new, more powerful cutter suction dredge to IHC Beaver Dredgers B.V. on March 14, 2008. The new 12,000KW dredge will replace "Mindi," which has been in service at the Canal since 1942 and has only a 9,000KW capacity. With an expected delivery date of May 2011, the new dredge will have the modern equipment, systems and components required for efficient operation. "IHC Beaver Dredgers B.V. is very well-respected in the industry and has the expertise to meet our needs. The construction of a dredge with more pumping capacity and the ability to dredge deeper will allow us to continue to make the waterway even more navigable, safe, reliant and efficient," said ACP Vice President of Operations Manuel Benitez. "With this new dredge, the ACP will boost the production capacity of our dredging fleet. This increase is necessary to meet the demands of the expansion, as well as the maintenance and modernization projects of the waterway." The new dredge will be constructed in The Netherlands and will have the capacity to dredge along the entire Canal including the Gaillard Cut (the narrowest stretch in the Panama Canal), Gatun Lake, and both Atlantic and Pacific entrances, at a depth of 25 meters, even after the expansion concludes.
The selection process for the construction of the new dredge began in September 2007, when the ACP released its request for proposals. The ACP awarded the $95.920 million contract to bidder IHC Beaver Dredgers B.V. after reviewing its proposal to ensure that all requirements were met. Dredge construction will begin within the coming months.

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Hornbeck Completes $114M Sale of OSVs to U.S. Navy

Hornbeck Offshore Services has closed the sale of three 250EDF class OSVs to the U.S. Navy, the company announced today.   The three vessels were sold for cash consideration of $114 million,

Haven Marine Bags Back To Back Dockings

Despite a slow start to the year, Haven Marine Services reports it is now seeing a change in fortunes with two dockings for Svitzer in quick succession, with one

Johan Sverdrup Contract to "Pioneering Spirit"

Statoil has signed a contract with Allseas for installation of three platform topsides on the Johan Sverdrup field.   The vessel will be installing the topsides for the drilling,

Dredging

Dredging Project to Protect Virginia Shoreline

Outer Continental Shelf sand will protect infrastructure, restore dunes and habitat   The U.S. Bureau of Ocean Energy Management (BOEM) and Naval Air Station Oceana at Dam Neck,

Van Oord, Falck Ink Safety Training Deal

Van Oord has signed a two year contract with Falck Safety Services for the provision of safety training.   Van Oord, a contractor for dredging, marine engineering and offshore energy projects,

Dutch Chief Mate Sentenced for Fatal Collision

Gerardus Chapel, the chief mate at the helm of the dredger that collided with a sailing yacht at the entrance to the River Orwell in Suffolk last summer, has received a six-month sentence.

 
 
Maritime Contracts Naval Architecture Navigation Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1402 sec (7 req/sec)