ACP Awards Contract for Construction of New Dredge

Wednesday, March 26, 2008

Moving forward with its equipment upgrades for the Expansion Program, the Panama Canal Authority (ACP) officially awarded the contract to design and build a new, more powerful cutter suction dredge to IHC Beaver Dredgers B.V. on March 14, 2008. The new 12,000KW dredge will replace "Mindi," which has been in service at the Canal since 1942 and has only a 9,000KW capacity. With an expected delivery date of May 2011, the new dredge will have the modern equipment, systems and components required for efficient operation. "IHC Beaver Dredgers B.V. is very well-respected in the industry and has the expertise to meet our needs. The construction of a dredge with more pumping capacity and the ability to dredge deeper will allow us to continue to make the waterway even more navigable, safe, reliant and efficient," said ACP Vice President of Operations Manuel Benitez. "With this new dredge, the ACP will boost the production capacity of our dredging fleet. This increase is necessary to meet the demands of the expansion, as well as the maintenance and modernization projects of the waterway." The new dredge will be constructed in The Netherlands and will have the capacity to dredge along the entire Canal including the Gaillard Cut (the narrowest stretch in the Panama Canal), Gatun Lake, and both Atlantic and Pacific entrances, at a depth of 25 meters, even after the expansion concludes.
The selection process for the construction of the new dredge began in September 2007, when the ACP released its request for proposals. The ACP awarded the $95.920 million contract to bidder IHC Beaver Dredgers B.V. after reviewing its proposal to ensure that all requirements were met. Dredge construction will begin within the coming months.

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

U.S., India to Seal Nuclear Deal

The United States and India have reached a breakthrough on two issues holding up civil nuclear cooperation between them, U.S. President Barack Obama told a news conference in New Delhi on Sunday.

U.S. Refinery Workers' Contract Talks Moving Slowly

With just a week of bargaining left until the national contract for U.S. refinery workers expires, the United Steelworkers union (USW) said talks with oil company

MSC Sinfonia Upgradation at Fincantieri Shipyard

Extension operations on MSC Sinfonia, the second out of four MSC cruise ships to undergo the Renaissance Programme of enhancements, have begunin the past days at Fincantieri shipyard in Palermo.

Dredging

Damen's Customised Dredger for Van Oord

Damen has signed a contract with leading dredging and marine contractor Van Oord for the supply of a CSD 650 custom suction dredger together with an FCS 1605 Fast Crew Supplier,

South Carolina Container Volumes Climb in 2014

The South Carolina Ports Authority (SCPA) reported that container business rose 12 percent in 2014, a year highlighted by strong volume growth and substantial forward

Van Oord Chooses Marlink VSAT Services

Marlink has been selected to provide Very Small Aperture Terminal (VSAT) services for the fleet of the international dredging and offshore contractor Van Oord.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1145 sec (9 req/sec)