ACP Awards Contract for Construction of New Dredge

Wednesday, March 26, 2008

Moving forward with its equipment upgrades for the Expansion Program, the Panama Canal Authority (ACP) officially awarded the contract to design and build a new, more powerful cutter suction dredge to IHC Beaver Dredgers B.V. on March 14, 2008. The new 12,000KW dredge will replace "Mindi," which has been in service at the Canal since 1942 and has only a 9,000KW capacity. With an expected delivery date of May 2011, the new dredge will have the modern equipment, systems and components required for efficient operation. "IHC Beaver Dredgers B.V. is very well-respected in the industry and has the expertise to meet our needs. The construction of a dredge with more pumping capacity and the ability to dredge deeper will allow us to continue to make the waterway even more navigable, safe, reliant and efficient," said ACP Vice President of Operations Manuel Benitez. "With this new dredge, the ACP will boost the production capacity of our dredging fleet. This increase is necessary to meet the demands of the expansion, as well as the maintenance and modernization projects of the waterway." The new dredge will be constructed in The Netherlands and will have the capacity to dredge along the entire Canal including the Gaillard Cut (the narrowest stretch in the Panama Canal), Gatun Lake, and both Atlantic and Pacific entrances, at a depth of 25 meters, even after the expansion concludes.
The selection process for the construction of the new dredge began in September 2007, when the ACP released its request for proposals. The ACP awarded the $95.920 million contract to bidder IHC Beaver Dredgers B.V. after reviewing its proposal to ensure that all requirements were met. Dredge construction will begin within the coming months.

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Statoil Awards Integrated Drilling Contract

Statoil is awarding Baker Hughes Norway the onshore contract for integrated drilling services for Johan Sverdrup. The estimated contract value is NOK 1.5 billion

ISS Signs Master Services Agreement with Technip

Inchcape Shipping Services (ISS) and Techniphave signed a contract to provide marine agency services and logistics for the Rashid C project in the Middle East.

Antwerp Port Sets up “One Belt One Road” Taskforce

“One Belt, One Road” is a Chinese development strategy launched at the end of 2013 that focuses on connectivity and cooperation among countries primarily in Eurasia.

Dredging

Water Conservation Measures at Panama Canal

The water levels at Gatun and Madden Lakes are currently well below the expected levels for this time of year. Based on a comprehensive analysis of historic data,

BMT Awarded Port Geographe Coastal Engineering Contract

BMT JFA Consultants (BMT), a subsidiary of BMT Group,  has been awarded a contract by the Western Australian Department of Transport (DoT) to provide services as

Charleston Harbor Deepening Gets US Funding

Charleston Harbor deepening project earns key federal funding for preconstruction engineering and design; U.S. Army Corps of Engineers allocates $1.303 million

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Port Authority Salvage Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1142 sec (9 req/sec)