ACP Awards Contract for Construction of New Dredge

Wednesday, March 26, 2008

Moving forward with its equipment upgrades for the Expansion Program, the Panama Canal Authority (ACP) officially awarded the contract to design and build a new, more powerful cutter suction dredge to IHC Beaver Dredgers B.V. on March 14, 2008. The new 12,000KW dredge will replace "Mindi," which has been in service at the Canal since 1942 and has only a 9,000KW capacity. With an expected delivery date of May 2011, the new dredge will have the modern equipment, systems and components required for efficient operation. "IHC Beaver Dredgers B.V. is very well-respected in the industry and has the expertise to meet our needs. The construction of a dredge with more pumping capacity and the ability to dredge deeper will allow us to continue to make the waterway even more navigable, safe, reliant and efficient," said ACP Vice President of Operations Manuel Benitez. "With this new dredge, the ACP will boost the production capacity of our dredging fleet. This increase is necessary to meet the demands of the expansion, as well as the maintenance and modernization projects of the waterway." The new dredge will be constructed in The Netherlands and will have the capacity to dredge along the entire Canal including the Gaillard Cut (the narrowest stretch in the Panama Canal), Gatun Lake, and both Atlantic and Pacific entrances, at a depth of 25 meters, even after the expansion concludes.
The selection process for the construction of the new dredge began in September 2007, when the ACP released its request for proposals. The ACP awarded the $95.920 million contract to bidder IHC Beaver Dredgers B.V. after reviewing its proposal to ensure that all requirements were met. Dredge construction will begin within the coming months.

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Shipping Turns From Banks to Equity Markets for Cash

Shipping companies are turning to equity markets to fill a growing funding gap, betting that investors hungry for decent returns will provide capital to a sector

Keel-Laid for Navy's 10th LCS at Austal Yard

The Navy and Austal USA held a keel-laying ceremony for the future 'USS Gabrielle Giffords', the Navy's 10th littoral combat ship (LCS), in Mobile, Ala., informs

Havyard to Build Hybrid Battery Arctic PSV

Norway's Havyard says it has signed a contract for the construction of a Havyard 833 WE ICE platform supply vessel with Fafnir Offshore HF. The vessel is to be

Dredging

Van Oord acquires 100% control of Dravo

Van Oord has acquired all shares of its Spanish subsidiary Dravo S.A.  Dravo S.A. has been owned, since 1987, by Van Oord (50%) and the Spanish company Dragados S.

US FMC Commissioner Visits Panama Canal Expansion Sites

Counsel to the U.S. Federal Maritime Commission informs that  Commissioner William P. Doyle has recently surveyed the construction site on a visit to the Pacific-side of the expanded Panama Canal.

Construction of Changi East Finger Extension

The working period for the construction of Changi East Finger Extension has been extended, GAC said in its daily Hot Port News report. The works will now be conducted from April 25 to October 24,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Pipelines Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1126 sec (9 req/sec)