ACP Awards Contract for Construction of New Dredge

Wednesday, March 26, 2008

Moving forward with its equipment upgrades for the Expansion Program, the Panama Canal Authority (ACP) officially awarded the contract to design and build a new, more powerful cutter suction dredge to IHC Beaver Dredgers B.V. on March 14, 2008. The new 12,000KW dredge will replace "Mindi," which has been in service at the Canal since 1942 and has only a 9,000KW capacity. With an expected delivery date of May 2011, the new dredge will have the modern equipment, systems and components required for efficient operation. "IHC Beaver Dredgers B.V. is very well-respected in the industry and has the expertise to meet our needs. The construction of a dredge with more pumping capacity and the ability to dredge deeper will allow us to continue to make the waterway even more navigable, safe, reliant and efficient," said ACP Vice President of Operations Manuel Benitez. "With this new dredge, the ACP will boost the production capacity of our dredging fleet. This increase is necessary to meet the demands of the expansion, as well as the maintenance and modernization projects of the waterway." The new dredge will be constructed in The Netherlands and will have the capacity to dredge along the entire Canal including the Gaillard Cut (the narrowest stretch in the Panama Canal), Gatun Lake, and both Atlantic and Pacific entrances, at a depth of 25 meters, even after the expansion concludes.
The selection process for the construction of the new dredge began in September 2007, when the ACP released its request for proposals. The ACP awarded the $95.920 million contract to bidder IHC Beaver Dredgers B.V. after reviewing its proposal to ensure that all requirements were met. Dredge construction will begin within the coming months.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

PDVSA Charters Another Algerian Crude Cargo

Venezuela's state-run oil company PDVSA has hired a supertanker to load a second 2 million-barrel cargo of Algerian crude, according to preliminary tanker fixture data.

VT Halter Begins Building LNG-powered ConRo Ships for Crowley

VT Halter Marine, Inc., a subsidiary of Vision Technologies Systems, Inc. (VT Systems), has commenced construction on the first of two liquefied natural gas (LNG)-powered,

US Navy Orders Demonstration Craft from Willard Marine

Willard Marine, Inc. (WMI) announced it has been selected through a solicitation process to supply a demonstration model of a new, advanced combatant craft for the U.

 
 
Maritime Contracts Maritime Security Naval Architecture Pipelines Port Authority Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2946 sec (3 req/sec)