Adesta Selected by MD Port Administration

Tuesday, November 08, 2005
Adesta announced that it has executed a $5.5M contract with the Maryland Port Administration to design and install a sophisticated security system at the Port of Baltimore. The wide-ranging project will include the installation of a remote video surveillance system as well as enhancements to terminal perimeter security. The expected completion date for the project is fall 2006. The system will provide the Port with total perimeter security and includes a fully scalable communications and electronic security network. The perimeter security measures include closed circuit television, video analytics by VistaScape Security Systems, and force protection for all terminals located at the Port. Real time intrusion detection technology and thermal and low light cameras will allow security personnel to monitor fences, terminals, gates, and piers in order to quickly respond to suspicious activities. The communications network will be a robust wide area network with both wireless and fiber optic links to connect the public terminals. The wide area network will have significant capacity to support expansion of the security system and other applications requiring port wide communications. The system installed by Adesta will increase the effectiveness of the Port security staff and ensure continued efficient and safe Port operations. Besides safeguarding the cargo that flows in and out of the Port, the system will also provide expanded safety and security for employees, visitors, and the citizens of Baltimore. These upgrades will help the Port of Baltimore meet the guidelines set forth by the Maritime Transportation Security Act (MTSA). As a member of the Department of Homeland Security, the U.S. Coast Guard implements these government regulations geared towards ports and other waterways as a result 9/11.
Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

Vacant Pier to Help Ease Long Beach Congestion

Pier S temporary depot to relocate empty containers for next five months    The Port of Long Beach expects a “Temporary Empty Container Depot” planned for a vacant

Vietnam Warship Visits Underscore Regional Tension

Vietnam on Tuesday showed off its two most powerful warships in the first-ever port call to the Philippines but an official said it was not trying to challenge

Vacant Pier at Long Beach Port to Ease Congestion

The Port of Long Beach expects a “Temporary Empty Container Depot” planned for a vacant pier on Terminal Island to be open and operating in December, which will

Maritime Security

Bollinger Delivers 11th FRC to the US Coast Guard

Bollinger Shipyards, Inc. has delivered the William Trump, the 11th Fast Response Cutter (FRC) to the United States Coast Guard.   The announcement was made by Bollinger Chief Operating Officer,

US Navy Evaluating SEWIP for LCS

The U.S. Navy is evaluating a scaled-down version of the Surface Electronic Warfare Improvement Program (SEWIP) system for potential incorporation on future Littoral Combat Ships (LCS),

Australian Defence Minister Says Would Not Trust Submarine Firm to Build Canoe

Australia's defence minister has said he would not trust state-owned Australian Submarine Corp (ASC) "to build a canoe", fuelling expectations that most work in

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1029 sec (10 req/sec)