Brazil Reconsiders Shelved LNG Plan

Wednesday, November 09, 2005
Brazil’s state oil company Petrobras may revive a shelved liquefied natural gas (LNG) imports project for the northeast due to disappointment with soaring costs of its planned Gasene natural gas pipeline, according to a Reuters report. A regasification plant could be an alternative to Gasene, or be used jointly with the pipeline as natural gas demand in Latin America’s largest country is soaring. Gasene is designed to connect Brazil’s southeastern and northeastern gas networks. Its initial estimated cost of over $1.1 billion went above $2 billion after Brazil brought in Chinese partner Sinopec earlier this year. Demand for natural gas is growing rapidly at over 20 percent a year in Brazil due to increasing industrial use and back-up thermoelectric plants. Brazil produces only associated gas and imports the bulk of pure natural gas from Bolivia. Source: Caracas Daily Journal
Maritime Reporter October 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Finance

DOF Installer Sells Offshore Vessel

DOF Subsea AS subsidiary, DOF Installer ASA, reported the sale of one of its three sister ships, an anchor handling tug supply (AHTS) vessel, to an international buyer.

Port City Plans for New Cargo Taxes Angers Kenya Govt, Shippers

Proposals by a local authority to impose new taxes on cargo at Kenya's main port has drawn opposition from the government and shippers, saying it will hike import

Odfjell Finalizes LPG/Ethylene Joint Venture Deal

Following Odfjell SE’s May 16, 2014 announcement declaring the signing of a definitive agreement to form a LPG/E shipping joint venture, Odfjell today announced

LNG

US Shipyard to Produce GTT's LNG Membrane Tanks

Gaztransport & Technigaz (GTT), a designer of membrane containment systems for the maritime transportation and storage of liquefied natural gas (LNG), via its U.

Skangass Builds LNG Terminal in Pori, Finland

With investment support from the Finnish Government of 185 million NOK Skangass has decided to build a new import terminal for LNG. The terminal will be completed in 2016.

Louisiana to Get Natural Gas Liquefaction and Fueling Facility

Tenaska Bayou LNG expected to meet growing marine, transportation and oil and gas exploration and production demand on the Gulf Coast Tenaska NG Fuels, LLC and Waller Marine, Inc.

 
 
Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0815 sec (12 req/sec)