Change of Command for Coast Guard Cutter

Tuesday, June 10, 2003
Captain David J. Visneski, was relieved as Commanding Officer of the Coast Guard Cutter HEALY today by Captain Daniel K. Oliver in a ceremony held onboard the cutter today. Under Captain Visneski’s leadership, HEALY sailed over 70,000 miles in completing three highly successful Polar deployments. The Coast Guard’s newest and largest icebreaker executed two scientific deployments to the Arctic and also completed a deployment to Antarctica. During the Arctic East Summer 2001 scientific mission to the eastern Arctic, scientists onboard HEALY discovered 12 underwater volcanoes, recovered over 8 tones of geological samples from the ocean floor, and even discovered a new species of shrimp. HEALY also became only the second U.S. surface ship to reach the North Pole during that deployment. While underway for Arctic West Summer 2002 in the western Arctic, HEALY supported 14 science parties simultaneously while providing the foundation for the most comprehensive science mission ever undertaken by a surface ship in the Arctic. Just recently, HEALY completed a successful emergency three month deployment to Antarctica when unprecedented ice conditions resulted in the need for a second icebreaker to enable the annual re-supply mission for the U.S. science station at McMurdo Station. HEALY and Coast Guard cutter POLAR SEA completed the annual break-in to McMurdo Station allowing both a container ship and a tanker to deliver essential supplies that allow ongoing scientific research efforts to continue on the frozen continent. Captain Visneski is retiring to the Seattle area after more than 27 years of Coast Guard service. He and his wife, Donnaann, will reside in Kent, WA. Captain Oliver assumes command of HEALY after serving as the Chief of Cutter Logistics at the Coast Guard’s Engineering Logistics Center in Baltimore, Maryland. HEALY departs on 13 June for another challenging Arctic scientific deployment that will take the ship to Baffin Bay in the Eastern Arctic, through the Northwest Passage and into the Western Arctic in support of three more scientific missions. The cutter will return to Seattle in the fall.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

CAGTC Members Win Big in TIGER VI

The U.S. Department of Transportation (USDOT) announced Friday that 72 projects will receive a total of $600 million from the sixth round of the Transportation

Ingalls Delivers NSC Hamilton to USCG

Huntington Ingalls Industries' (HII) Ingalls Shipbuilding division delivered the National Security Cutter Hamilton (WMSL 753) to the U.S. Coast Guard today. The

Commissioner Doyle Addresses NCBFAA

Federal Maritime Commissioner William P. Doyle spoke today at the National Customs Brokers & Forwarders Association of America (NCBFAA) Government Affairs Conference in Washington, DC.

Technology

New Generation of Turbochargers Announced

MAN Diesel & Turbo has announced the development of a new turbocharger series specifically matched to the requirements of two-stroke engines. For the first time ever,

Green Passenger Ferries from Faaborg Vaerft

The first full-electrical passenger ferry in composite is delivered to Ballerina AB in Stockholm, Sweden. Faaborg Vaerft A/S has delivered the first full-electrical passenger vessel,

IGCC System for Tokyo Electric Power

A consortium led by Mitsubishi Hitachi Power Systems, Ltd. (MHPS) has received an order from Tokyo Electric Power Company, Incorporated (TEPCO) for design work

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pipelines Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1771 sec (6 req/sec)