Donjon Removes Rail Bridge Span

Monday, July 07, 2008

Putting its heavy-lift capability to the test, on June 24, 2008, Donjon Marine Co., Inc. removed an old, rusted, 1,000-ton Amtrak rail bridge span located across the Thames River in New London, Connecticut.   Donjon’s Chesapeake 1000, the largest floating heavy-lift crane on the East Coast, hoisted the bridge span -- in place at that location for 89 years -- from the track and transported it onboard one of its new 1400-class deck barges (Witte 1402) back to Port Newark for dismantling and disposal. The old bridge span will be replaced with a new, 1,888-foot-long, 35-feet-wide section. 

 www.donjon.com. 

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Salvage

Sunken WW II Ship Oil Leak Plugged

Atlantic Coast Marine Group, Inc. successfully responds to World War II era motor tanker leaking massive cargo of oil into the Atlantic Ocean's waters. Beaufort,

Pier Damaged at Port Canaveral

Undergoing Repairs While Coast Guard Investigates   The U.S. Coast Guard is investigating a weekend incident that caused pier damage and scattered concrete debris in the harbor on Sunday.

Korea Ferry Businessman's Body Located

Yoo had been target of South Korea's largest manhunt; Failure of police to catch Yoo had been burden for Park government. The body of South Korea's most wanted man,

 
 
Maritime Contracts Maritime Standards Naval Architecture Pipelines Pod Propulsion Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1431 sec (7 req/sec)