Donjon Removes Rail Bridge Span

Monday, July 07, 2008

Putting its heavy-lift capability to the test, on June 24, 2008, Donjon Marine Co., Inc. removed an old, rusted, 1,000-ton Amtrak rail bridge span located across the Thames River in New London, Connecticut.   Donjon’s Chesapeake 1000, the largest floating heavy-lift crane on the East Coast, hoisted the bridge span -- in place at that location for 89 years -- from the track and transported it onboard one of its new 1400-class deck barges (Witte 1402) back to Port Newark for dismantling and disposal. The old bridge span will be replaced with a new, 1,888-foot-long, 35-feet-wide section. 

Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


U.S. East Coast Threatened by Hurricane Joaquin

Hurricane Joaquin was gaining strength on Thursday as it moved toward the Bahamas, with forecasts still inconclusive on whether the storm would slam into the U.

Two Indian Shipbreakers Deemed HKC Compliant

ClassNK issues Hong Kong Convention Statements of Compliance to two ship recycling facilities in India    Two ship recycling facilities in Gujarat, India, R. L.

MN 100: Elastec

The Company: Elastec manufactures and markets innovative pollution control and recovery systems. The company’s core competency is oil spill response: skimmers,

Maritime Careers / Shipboard Positions Maritime Security Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1111 sec (9 req/sec)