Donjon Removes Rail Bridge Span

Monday, July 07, 2008

Putting its heavy-lift capability to the test, on June 24, 2008, Donjon Marine Co., Inc. removed an old, rusted, 1,000-ton Amtrak rail bridge span located across the Thames River in New London, Connecticut.   Donjon’s Chesapeake 1000, the largest floating heavy-lift crane on the East Coast, hoisted the bridge span -- in place at that location for 89 years -- from the track and transported it onboard one of its new 1400-class deck barges (Witte 1402) back to Port Newark for dismantling and disposal. The old bridge span will be replaced with a new, 1,888-foot-long, 35-feet-wide section. 

 www.donjon.com. 

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Salvage

Smoke: Cruise Ship Evacuates Passengers

A number of passengers and crew members were evacuated after smoke was spotted billowing from the front section of Carnival Liberty cruise ship docked in the Dutch Caribbean nation of St Maarten.

Salvage, Wreck Removal Beset with Chronic Problems

The basic nature of maritime casualties, salvage and wreck removal has evolved rapidly over the last few years. Ships and offshore constructions have become more technologically elaborate,

EALs & Oil Spill Remediation

EALs & Oil Spill Remediation: The Effects of EALs on Oil Spill and Discharge Reporting and Remediation In the wake of increased environmental scrutiny and potentially expanding liability issues,

 
 
Maritime Contracts Maritime Security Naval Architecture Offshore Oil Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1302 sec (8 req/sec)