Donjon Removes Rail Bridge Span

Monday, July 07, 2008

Putting its heavy-lift capability to the test, on June 24, 2008, Donjon Marine Co., Inc. removed an old, rusted, 1,000-ton Amtrak rail bridge span located across the Thames River in New London, Connecticut.   Donjon’s Chesapeake 1000, the largest floating heavy-lift crane on the East Coast, hoisted the bridge span -- in place at that location for 89 years -- from the track and transported it onboard one of its new 1400-class deck barges (Witte 1402) back to Port Newark for dismantling and disposal. The old bridge span will be replaced with a new, 1,888-foot-long, 35-feet-wide section. 

 www.donjon.com. 

Maritime Reporter October 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Salvage

Coast Guard Investigating Fatal Boating Collision

The Coast Guard is investigating a fatal collision between a towboat and a pleasure craft near Cincinnati, Thursday evening. Watchstanders at Coast Guard Sector

Coast Guard: Investigations Underway in Cutter Collision

The Coast Guard is conducting a series of formal investigations after Tuesday’s collision involving a Coast Guard cutter and a fishing vessel off the coast of Puerto Rico.

Oil Spill at Quintero Bay, Chile

An oil spill occurred at Quintero Bay, Nr Valparaiso, Chile, following an incident on Thursday, September 24 at the Monobuoy Terminal when the MT Mimosa cut off hoses and cargo connection,

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Pod Propulsion Port Authority Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0960 sec (10 req/sec)