Donjon Removes Rail Bridge Span

Monday, July 07, 2008

Putting its heavy-lift capability to the test, on June 24, 2008, Donjon Marine Co., Inc. removed an old, rusted, 1,000-ton Amtrak rail bridge span located across the Thames River in New London, Connecticut.   Donjon’s Chesapeake 1000, the largest floating heavy-lift crane on the East Coast, hoisted the bridge span -- in place at that location for 89 years -- from the track and transported it onboard one of its new 1400-class deck barges (Witte 1402) back to Port Newark for dismantling and disposal. The old bridge span will be replaced with a new, 1,888-foot-long, 35-feet-wide section. 

 www.donjon.com. 

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Salvage

Documentary Examines Shipbreaking Practices in Bangladesh

Toxic ships for Bangladesh: TV documentary on German ship owners and their shipbreaking practices A new documentary titled "Giftiger Tankerschrott für Bangladesch

Boater Rescued from Sailboat Blaze

The U.S. Coast Guard assisted with the rescue of a boater Monday after the man's 33-foot sailboat caught fire five miles west of Windmill Point in the Chesapeake Bay.

WWII Wrecks Found 30 Miles off US Coast

The wreck of a World War Two German U-boat and a freighter that sank 72 years ago have been discovered off the North Carolina coast by U.S. researchers, officials said.

 
 
Maritime Contracts Maritime Security Naval Architecture Pipelines Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2008 sec (5 req/sec)