Drilling to Start in Iran’s Caspian Blocks

Tuesday, August 30, 2005
Three-dimensional seismological operations at Iranian blocks in Caspian Sea in preparation for spudding two wells are underway and drilling operations are to begin on February 1, according to PIN.

Deputy minister of oil for Caspian Sea oil and gas affairs told Petroenergy Information Network that a bid is underway for choosing a foreign contractor with experience in working at deep waters and the results will be announced in two weeks.

After drilling test well, exploration wells would be drilled at a depth of 800 m from the sea level and will continue up to 6,000 m below the seabed?. Iran Alborz semi-floating platform will bee used for drilling operations whose construction is almost complete, the article noted.

Salehiforuz noted that drilling at deep waters will be the first of its kind in Iran and drilling wells at a depth of more than 800 m is technically very complicated the likes of which have not been done save for a number of areas in North Sea, Mexico, and Brazil. (Source: IranMania)

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

MSC Geneva Gets Fatter

A revolutionary new option to scrapping for younger panamax containerships deemed too small for a tradelane involves widening the vessel rather than adding length.

Record Bulk Shipping Demolition Rates in 1H15

Monthly demolition rates in the dry bulk shipping sector averaged 3.3 million DWT for 1H15, according to new figures from BIMCO, compared to 1.3 million DWT last year.

Silversea Cruises Plans New Flagship

Cruise operator Silversea Cruises has unveiled its new flagship, the Silver Muse, which will begin sailing the seas in April 2017.    Built by Italian shipbuilding company Fincantieri,

Offshore

Indonesia Expects Total to Decide on Mahakam within days

French oil firm Total  will decide how much interest it will retain from 2018 in Indonesia's offshore Mahakam oil and gas block over the next two days, the

Water Conservation Measures at Panama Canal

The water levels at Gatun and Madden Lakes are currently well below the expected levels for this time of year. Based on a comprehensive analysis of historic data,

First Subsea Wet Gas Compressor Installed

After several years of technology development, construction and testing the first subsea wet gas compressor in the world is now installed at the Gullfaks C platform in the North Sea.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Pipelines Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1204 sec (8 req/sec)