ExxonMobil Awards Design Contracts

Tuesday, June 20, 2006
ExxonMobil has awarded four engineering design contracts for a possible second world-scale steam-cracking complex in Singapore. The complex is to be located at the company's existing refining and chemical site at Jurong Island. All the four contracts concern the design of different stages of the chemical refining process. One contract was given to Aker Kvaerner to design a polyethylene unit. Mitsui Engineering and Shipbuilding won a deal to design the steam-cracker's polypropylene and specialty elastomers units. Another contract was awarded to Foster Wheeler and WorleyParsons for the design of an aromatics extraction unit, an oxo alcohol plant expansion, and associated plant infrastructure. Mustang Engineering was awarded the contract to design the process control and instrumentation. ExxonMobil has also invited bids from two groups - Shaw Stone & Webster and a joint venture between Technip and Chiyoda - for the design, engineering, procurement and construction work for the proposed steam cracker. Source: Singapore News
Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Variable Bore Rams is 35

Variable Bore Rams, Inc. (VBR), one of the largest original equipment manufacturer (OEM) ram and BOP component providers in the world, is celebrating its 35th

Taylor to Chair NOIA Board

The National Ocean Industries Association (NOIA) Board of Directors has elected Cindy B. Taylor as Chair and Kevin McEvoy as Vice Chairman for the upcoming 2015-2016 term.

AVEVA Launches Software Upgrade

New releases of AVEVA Electrical and AVEVA Instrumentation provides powerful new functionality for engineering teams   AVEVA announced new productivity enhancements

Contracts

Vigor’s Tacoma Yard Delivers Breasting Barges to Foss

Vigor Industrial expands its newbuild capacity in Washington; Tacoma yard delivers three breasting barges   Fabrication teams at Vigor Industrial’s Tacoma, Wash.

Hands Across the Water

U.S. firms leverage Netherlands-based Damen Shipyard’s vessel designs and technical support. For nearly 40 years, Damen Shipyards Group in the Netherlands has

Icebreakers Ordered for Neft’s Novy Port Project

Aker Arctic’s icebreaker design selected for Gazprom Neft’s Novy Port project   Aker Arctic and Vyborg Shipyard have confirmed a contract for the design of two

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Port Authority Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1728 sec (6 req/sec)