First Full-Scale Floating Wind Turbine

Sunday, September 13, 2009
Photo courtesy StatoilHydro

Technip joins StatoilHydro in celebrating the inauguration of the Hywind demonstration wind turbine, which took place on September 8 in Karmøy, Norway. Located 10 kilometers offshore Karmøy, Hywind is the first full-scale floating wind turbine and has a capacity of 2.3 MW.

Following the award of the turnkey contract for the substructure of the wind turbine in May 2008, Technip’s operating center in Oslo, Norway, performed the project management and installation engineering. Detail design and fabrication of the substructure was carried out at the Group’s construction yard in Pori, Finland, which is specialized in the construction of Spar platforms.

After being towed in a horizontal position to the Åmøyfjoden fjord in Norway, the substructure was up-ended and stabilized before assembly with the wind mill, including the generator and the turbine blades. The completed floating wind mill, now in a vertical position, was then towed to the final location by three vessels and connected to the anchor system in June 2009. The total structure measures 165 meters of which 100 meters below the sea level.

The Hywind demonstration unit will operate for a period of at least two years. The objective is to gain knowledge on practical aspects of the operation and maintenance of floating offshore windmills.

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Hofste, Montijn Nominated to Supervisory Board Fugro

Fugro N.V. announces that the Supervisory Board of Fugro nominates Mrs. P.H.M. Hofsté and Mrs. A.H. Montijn for appointment as members of the Supervisory Board

Oil Platform Ablaze in the Gulf of Mexico

Fire broke out on an unmanned oil platform in the Gulf of Mexico approximately five miles south of Port Fourchon, La., the Bureau of Safety and Environmental Enforcement (BSEE) reported.

Subsea Crane Takes a Long Journey

Last September the test bed in Rostock was the stage of a single lift of the RL-K 7500 subsea crane. The same crane was then loaded and shipped to the South Korean customer.

Environmental

Bangladesh Aims to be World's 'First Solar Nation

Residents of Islampur, a remote village in the northern Bangladeshi district of Naogaon, were stunned one night last summer when the darkness was suddenly illuminated

India Not Pressurized by US-China Deal

Indian Prime Minister Narendra Modi said a climate deal between the United States and China does not put pressure on India, but that global warming itself was reason to take action.

U.S. Refinery Workers' Contract Talks Moving Slowly

With just a week of bargaining left until the national contract for U.S. refinery workers expires, the United Steelworkers union (USW) said talks with oil company

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Pipelines Pod Propulsion Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1608 sec (6 req/sec)