First RasGas LNG Delivery Arrives in Mexico

Thursday, October 12, 2006
Ras Laffan Liquefied Natural Gas Company Limited (RasGas) made its first delivery of liquefied natural gas (LNG) from the shores of Qatar to Mexico on October 8. This event followed a spot sale to Shell Western LNG B V by Ras Laffan Liquefied Natural Gas Company Limited. The LNG cargo was loaded on board the LNG tanker Fuwairit, and departed from Ras Laffan, on September 16, the press release added. The voyage of 22 days over a distance of 9,915 nautical miles was routed through the Suez Canal and the Straits of Gibraltar to the Terminal de LNG de Altamira, Mexico. Terminal de LNG de Altamira is the first LNG receiving terminal in Mexico and came into operation only in August of this year. The Fuwairit is RasGas’ first dedicated ship, and was delivered to RasGas on January 13, 2004 by the owners Camartina Shipping Inc. The vessel was built in the Samsung Heavy Industries, Korea, and has a cargo capacity of 138,000m3. Since delivery, the Fuwairit has made 32 cargo deliveries from Ras Laffan to RasGas’ customers in the Far East and Europe. Source: The Peninsula
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Nordic American Offshore Declares Dividend

Nordic American Offshore Ltd. today announced that its board of directors has declared a dividend of $0.45 per common share for the third quarter 2014. This is the same as for the second quarter 2014.

Bollore Africa Logistics Sees Profit Plunge in H1

First half 2014 profit at shipping company Bollore Africa Logistics plunged to 5.89 billion CFA francs ($11.48 million) from 9.45 billion CFA francs in the same period last year,

Ocean Rig, Petrobras Agree to $1.1b Drill Ships Lease

Cyprus-based Ocean Rig UDW Inc said on Monday that it signed a $1.1 billion three-year contract with Brazil's state-run oil company, Petroleo Brasileiro SA, to

LNG

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

LNG America, Buffalo Marine to Design LNG Bunker Fuel Network

LNG America announced it has entered an agreement with Buffalo Marine Service, Inc. (Buffalo Marine) to cooperate on the design of an LNG bunker fuel network for the U.

World’s 1st LNG Hybrid Barge Christened "Hummel"

The world’s first LNG hybrid barge of Becker Marine Systems was christened with the name "Hummel" on October 18, 2014, at Grasbrook Quay in HafenCity Hamburg.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1218 sec (8 req/sec)