Four Groups to Compete for Naval Contract

Tuesday, June 27, 2006
The Ottowa Business Journal has reported that four consortia have been selected to bid on a $2.9 billion contract to supply three new joint support ships to the Canadian Forces, the first in a week-long series of announcements by the Harper government of new equipment for Canada's sailors, soldiers and airmen. Irving Shipbuilding, BAE Systems (Project) Limited (BAE Systems Naval Ships), ThyssenKrupp Marine Systems AG and SNC-Lavalin Profac Inc will bid on the project definition phase---including preliminary ship design, project implementation plans, and an in-service support plan. Two groups will then be awarded contracts worth $12.5 million each for the project definition phase, and will compete for the final implementation contract. Based on the definition phase plans, one consortium will be chosen to build the ships. The $2.9 billion price tag includes a base cost of $2.1 billion, plus an estimated $800 million in contracted in-service support over 20 years.

The three new ships will replace two aging supply ships. However, they will have a much-expanded military role that goes far beyond simply re-supplying naval task forces at sea.

Ottawa Business Journal

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Ecuador Coastguard Orders Damen Patrol Boats

Damen announced it has recently signed a contract with AstillerosNavalesEcuatorianos (Astinave) to construct two Damen Stan Patrols (Spa) 5009 for the Ecuadorian Coastguard.

LNG America Selects Topside Designer for LNG Bunker Barge

LNG America has selected Taylor-Wharton to commence the front-end engineering and design work for the cryogenic topside of the company’s 3,000 cubic meter Gemini

Lithuania Inks First Statoil LNG Deal

Lithuania seeks to cut dependence on Russia; Statoil to supply 0.54 bcm of gas per year. This will cover about 20 pct of Lithuania's demand. Lithuania signed

Barges

LNG America Selects Topside Designer for LNG Bunker Barge

LNG America has selected Taylor-Wharton to commence the front-end engineering and design work for the cryogenic topside of the company’s 3,000 cubic meter Gemini

Xervo and SH Group Expanding in Norway

The possible introduction of the NORSOK R-002 standards means there’s a big job to be done upgrading the lifeboats and rescue boats onboard the rigs already operating in the Norwegian sector.

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1203 sec (8 req/sec)