Gladding-Hearn Delivers Premiere High Speed Passenger Cat

Thursday, August 23, 2001
Commencing this summer, passengers traveling from Point Judith to Block Island, R.I. by ferry, can, for the first time, make the trip in about half the time. In July, Island Hi-Speed Ferry received a new 99-ft. (30.4 m) Athena, a high-speed catamaran ferry built by Gladding-Hearn Shipbuilding. The 250-passenger fast ferry has a top speed of 34 knots when loaded with a dwt of 18.6 tons, and completes the 12-mile ocean crossing in about 22 minutes, according to shipyard officials.

Designed for commuter and tourist service by Incat Designs of Sydney, Australia, the ferry is operated by the start up company partnered with Boston Harbor Cruises.

The all-aluminum vessel is powered by twin Caterpillar 3412E, 1,100 bhp diesel engines, which drive Hamilton HM 521 water jets through ZF 1950 reduction gears. The vessel features Incat's single chine Z-bow hulls. The resulting longer waterline improves the vessel's high-speed performance and sea-keeping ability. Its Vosper/MDI active trim tab motion control system is expected to reduce its motion by as much as 60 percent.

Interior arrangements include upholstered seating for 190 passengers, a snack bar, and three heads. Heating and air conditioning is provided by a 150,000 Btu system.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Kiel's 2014 Cruise Shipping Season Ends

Expanded terminal capacities created at Berth 1 This year’s cruise shipping season in Kiel closes on the evening of October 18 when the AIDAcara sets sail for the Canary Islands.

Cruise Ship Passenger Isolated Due to Ebola Risk

A Texas hospital employee who may have handled lab specimens from an Ebola victim has entered voluntary isolation on board a Carnival cruise ship in the Caribbean.

APM Completes $2m Refit Ahead of Schedule

Atlantic Pacific Marine has completed the $2 million refit of the Crystal Symphony three days ahead of schedule. A team of 130 men worked around the clock while

 
 
Maritime Contracts Maritime Security Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0929 sec (11 req/sec)